Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Water line extension of approx.3,850 LF of 12" C900 PVC water line, including valves, fire hydrants, connection to water meters, and all other associated improvements, including connection to existing water line and abandonement of existing water line.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Porter Special Utility District is soliciting competitive sealed proposals for the Old Sorters Water Line – Phase 1 project in Montgomery County, Texas. The work includes approximately 3,850 linear feet of 12‑inch C900 PVC water line with valves, fire hydrants, connections to meters, and other associated improvements, including connection to existing lines and abandonment of existing lines. A pre‑bid conference is scheduled for January 13, 2026 at 2:00 PM at the PSUD office, and bids are due January 20, 2026 at 2:00 PM CST via CivCast or in person.
Posted Date
-
Due Date
Jan 20, 2026
Release: -
Close: Jan 20, 2026
Porter Special Utility District is soliciting competitive sealed proposals for the Old Sorters Water Line – Phase 1 project in Montgomery County, Texas. The work includes approximately 3,850 linear feet of 12‑inch C900 PVC water line with valves, fire hydrants, connections to meters, and other associated improvements, including connection to existing lines and abandonment of existing lines. A pre‑bid conference is scheduled for January 13, 2026 at 2:00 PM at the PSUD office, and bids are due January 20, 2026 at 2:00 PM CST via CivCast or in person.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction contract for Cherry Hill Water System Phase I & II water line improvements — turnkey water main installation requiring a firm-fixed-price general contractor to provide all supervision, labor, materials, equipment, tools, and installation per the project manual; Virginia SCC registration and Proof of Authority to Transact Business in Virginia required.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Construction contract for Cherry Hill Water System Phase I & II water line improvements — turnkey water main installation requiring a firm-fixed-price general contractor to provide all supervision, labor, materials, equipment, tools, and installation per the project manual; Virginia SCC registration and Proof of Authority to Transact Business in Virginia required.
AvailableWork consisting of a ringwall is considered suitable for the 14-ft diameter finished water tank. Subgrades for the finished water tank should consist of competent residuum or new compacted structural fill following the undercut of the loose stratum a materials. An allowable contact pressure of of 2,000 psf (net allowable soil bearing pressure) is anticipated for the finished water tank. A factor of safety of 3.0 should be considered against general shear failure for this condition
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Work consisting of a ringwall is considered suitable for the 14-ft diameter finished water tank. Subgrades for the finished water tank should consist of competent residuum or new compacted structural fill following the undercut of the loose stratum a materials. An allowable contact pressure of of 2,000 psf (net allowable soil bearing pressure) is anticipated for the finished water tank. A factor of safety of 3.0 should be considered against general shear failure for this condition
AvailableLoch fyne phase ii & phase iii line renewal - CM/GC project.
Posted Date
Nov 21, 2025
Due Date
Jan 9, 2026
Release: Nov 21, 2025
Close: Jan 9, 2026
Loch fyne phase ii & phase iii line renewal - CM/GC project.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →