Summary
Modifications to the wastewater treatment plant including replacement of fine screening and grit removal equipment; demolition of trickling filter biological treatment structures and equipment; construction of oxidation ditches, final clarifiers, and RAS/WAS Pump Building; conversion from chlorine disinfection to ultraviolet disinfection; construction of aerobic digesters and modifications to the pump building to house blowers; demolition of the egg shaped anaerobic digesters; modifications to the existing sludge storage tank and construction of additional sludge storage; modifications to the Administration Building, construction of a storage building, electrical power distribution and standby power improvements; site utility and roadway improvements; construction of stormwater detention; and all necessary connections and appurtenances.