Retrieving RFP details
Release
Close
Town of Blue Hill
The project includes the upgrade of two existing pump stations and the construction of one new High Tide pump station at the existing wastewater treatment plant site. Work under this project includes demolition and site clearing; structural and trench excavation, earthwork, backfill, aggregates, crushed stone and compaction; site pavement, site restoration, erosion control, utilities including sewerage, drainage and water service; chain link fence, precast concrete structures, cast-in-place concrete, wood framed structures, miscellaneous building improvements, metals, gratings and railings; steel and fiberglass doors, frames and door hardware; overhead door, windows; painting, and all equipment including packaged pump station equipment, headworks grinder, chlorine contact tank mixer, chemical pumps and flow meter equipment; installation of High Tide Pump Station equipment; gates, process piping and valves, expansion joints, pipe hangers and supports; ventilation; emergency standby generators, electrical equipment, wiring, conduits, controls, alarm and instrumentation systems.
Harris County Mud 495
Wastewater Treatment Plant No. 1 Phase 5 (1.50 MGD).
Charles County
Seeking proposals from qualified engineering firms for services on the headworks upgrade project at the wastewater treatment plant. .
Albany Port District
Construction of both a packaged wastewater treatment plant and fire pump house (2-part bid).
Release
Sep 29, 2025
Close
Nov 14, 2025