Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of improvements to one Lift Station and the installation of a filter box, replacing a manhole and 8” sanitary sewer, construction of eight additional leach fields, stormwater conveyance, Infiltration and Inflow (I/I) reduction, and bid alternates consisting of fencing, installation of aeration to the primary lagoon, repaving of the access road and furnishing of a portable pump.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide wastewater system improvements that also includes 1 LS erosion control; 1 LS bypass pumping and temporary treatment during wastewater treatment facility improvements; 1 LS site earthwork and final grading. Includes grading for UV, operations building and associated piping; 1 LS gravel pavement. See outside link.
Posted Date
-
Due Date
Jan 21, 2026
Close: Jan 21, 2026
Provide wastewater system improvements that also includes 1 LS erosion control; 1 LS bypass pumping and temporary treatment during wastewater treatment facility improvements; 1 LS site earthwork and final grading. Includes grading for UV, operations building and associated piping; 1 LS gravel pavement. See outside link.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes improvements to the town's existing wastewater treatment plant (wwtp) and collection system, the wwtp work includes but is not limited to conversion of the existing sludge digester to a new sequential batch reactor (sbr) with new diffused aeration equipment, new sbr blowers with vfd's and dissolved oxygen (do) control, backup sbr control system, structural improvements to the existing concrete tanks, conversion of the existing chlorine contact tank to a new uv disinfection tank, new effluent pump station with new force main and outfall structure, the collection system work includes but is not limited to replacing the existing lift station with a new submersible lift station, wet well, valve pit, electrical, controls, cloud-based monitoring system, and replacement of the existing force main.
Posted Date
Dec 10, 2025
Due Date
Feb 17, 2026
Release: Dec 10, 2025
Close: Feb 17, 2026
Work includes improvements to the town's existing wastewater treatment plant (wwtp) and collection system, the wwtp work includes but is not limited to conversion of the existing sludge digester to a new sequential batch reactor (sbr) with new diffused aeration equipment, new sbr blowers with vfd's and dissolved oxygen (do) control, backup sbr control system, structural improvements to the existing concrete tanks, conversion of the existing chlorine contact tank to a new uv disinfection tank, new effluent pump station with new force main and outfall structure, the collection system work includes but is not limited to replacing the existing lift station with a new submersible lift station, wet well, valve pit, electrical, controls, cloud-based monitoring system, and replacement of the existing force main.
AvailableWork includes: Install four RAS pumps pre-purchased by the city; install two WAS pumps; install new RAS and WAS piping, including excavation and installation of precast utility vaults and paving; install related electrical and instrumentation improvements include pressure instruments and flow meters; and install walls at the WAS Station, including doors, exhaust fans, louvres, and heater.
Posted Date
Dec 10, 2025
Due Date
Jan 22, 2026
Release: Dec 10, 2025
Close: Jan 22, 2026
Work includes: Install four RAS pumps pre-purchased by the city; install two WAS pumps; install new RAS and WAS piping, including excavation and installation of precast utility vaults and paving; install related electrical and instrumentation improvements include pressure instruments and flow meters; and install walls at the WAS Station, including doors, exhaust fans, louvres, and heater.
AvailableProject consists of improvements to the primary and secondary lagoon. The work consists of the following but not limited to earthwork, installation of geomembrane lagoon liner, remove and replace manhole, installation of a trash basket, bypass pumping, etc..
Posted Date
-
Due Date
Jan 30, 2026
Close: Jan 30, 2026
Project consists of improvements to the primary and secondary lagoon. The work consists of the following but not limited to earthwork, installation of geomembrane lagoon liner, remove and replace manhole, installation of a trash basket, bypass pumping, etc..
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →