Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This solicitation (69056725B000004) issued by the Western Federal Lands Highway Division in collaboration with Lincoln County, WA requests construction services to improve and stabilize Hawk Creek Road, addressing drainage and erosion issues. Work includes replacing twin 36-inch CMP culverts with a single 54-inch CMP culvert with concrete headwalls and riprap, installing shallow ditches and additional 24-inch culverts, fitting aprons and riprap pads, and building a French drain/underdrain system to mitigate ponding. The opportunity is a Small Business set-aside (NAICS 237310) with an estimated value range of approximately $2,000,000$6,000,000 and a response deadline of Jan 15, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Road capacity improvements.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Close: Dec 17, 2025
Road capacity improvements.
AvailableRelease: Nov 28, 2025
Close: Dec 18, 2025
Work includes road improvements.
AvailableWork includes 497 LF temporary fence; 4931 CY earth excavation; 2438 CY topsoil excavation and placement; 11907 SY erosion control blanket; 1218 SY heavy duty erosion control blanket; 5106 LF perimeter erosion barrier; 44 SY stone riprap, class a3; 14122 SY aggregate subgrade improvement 12"; 682 sy portland cement concrete base course widening 8"; 65 SY hot-mix asphalt surface removal - butt joint; 350 SY pavement patching, type ii, 8"; 5320 SY structure excavation; 545 LF bridge fence railing, curved; 285 LF storm sewers, class a, type 2 15"; 5 EA fire hydrants to be moved; 2 EA manholes to be adjusted; 559 LF temporary pavement marking - line 6" - epoxy.
Posted Date
Nov 4, 2025
Due Date
Jan 8, 2026
Release: Nov 4, 2025
Close: Jan 8, 2026
Work includes 497 LF temporary fence; 4931 CY earth excavation; 2438 CY topsoil excavation and placement; 11907 SY erosion control blanket; 1218 SY heavy duty erosion control blanket; 5106 LF perimeter erosion barrier; 44 SY stone riprap, class a3; 14122 SY aggregate subgrade improvement 12"; 682 sy portland cement concrete base course widening 8"; 65 SY hot-mix asphalt surface removal - butt joint; 350 SY pavement patching, type ii, 8"; 5320 SY structure excavation; 545 LF bridge fence railing, curved; 285 LF storm sewers, class a, type 2 15"; 5 EA fire hydrants to be moved; 2 EA manholes to be adjusted; 559 LF temporary pavement marking - line 6" - epoxy.
Proposals are requested for a pedestrian crossing, safety, and concept study on Creek Road from Union Park Avenue to 3500 East.
Posted Date
-
Due Date
Dec 19, 2025
Close: Dec 19, 2025
Proposals are requested for a pedestrian crossing, safety, and concept study on Creek Road from Union Park Avenue to 3500 East.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis