Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes road improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide concept, right of way and construction plans for improvements to quacco road from easthaven/spanton crescent to the i-95 overpass.
Posted Date
Oct 24, 2025
Due Date
Jan 14, 2026
Release: Oct 24, 2025
Close: Jan 14, 2026
Provide concept, right of way and construction plans for improvements to quacco road from easthaven/spanton crescent to the i-95 overpass.
AvailablePremium
Access the largest public sector contact database
Work includes approx. 1 LS of clearing and grubbing; 3 EA of removing drainage structure; 2,830 LF of sawcutting pavement; 50 LF removal and reinstall fence; 65 LF of removing existing pipe; 441, abandon existing pipe; 1,600 CY of roadway excavation; 2,630 TN of crushed surface base course; 2 EA of grate inlet type 2; 31 LF of 4" drain pipe; 2,233 LF of testing storm sewer pipe; 1,479 LF of 36" storm sewer pipe; 1,910 SF of structural earth wall; 1,050 TN of HMA CL 3/8" PG 64H-28; erosion control;2,340 LF of cement concrete traffic curb n gutter; 3,460 LF of 6" painted white wide line; 1 LS of pedestrian traffic control; 97 SF of permanent signing; 1 LS of rectangular rapid flashing beacon-mid block; 360 LF of pedestrian handrail; 21,032 SF of shoring or extra excavation; 580 SY cement concrete sidewalk; 70 SY of cement concrete curb ramp; 2 EA of connection to drainage structure;
Posted Date
-
Due Date
Jan 6, 2026
Close: Jan 6, 2026
Work includes approx. 1 LS of clearing and grubbing; 3 EA of removing drainage structure; 2,830 LF of sawcutting pavement; 50 LF removal and reinstall fence; 65 LF of removing existing pipe; 441, abandon existing pipe; 1,600 CY of roadway excavation; 2,630 TN of crushed surface base course; 2 EA of grate inlet type 2; 31 LF of 4" drain pipe; 2,233 LF of testing storm sewer pipe; 1,479 LF of 36" storm sewer pipe; 1,910 SF of structural earth wall; 1,050 TN of HMA CL 3/8" PG 64H-28; erosion control;2,340 LF of cement concrete traffic curb n gutter; 3,460 LF of 6" painted white wide line; 1 LS of pedestrian traffic control; 97 SF of permanent signing; 1 LS of rectangular rapid flashing beacon-mid block; 360 LF of pedestrian handrail; 21,032 SF of shoring or extra excavation; 580 SY cement concrete sidewalk; 70 SY of cement concrete curb ramp; 2 EA of connection to drainage structure;
AvailableProvide roadway and infrastructure improvements, will include the installation of water and sewer services, storm water ponds and drain system, curb and sidewalks, clearing and grubbing, maintenance of traffic throughout the project, and all other aspects. See outside link.
Posted Date
Dec 1, 2025
Due Date
Jan 7, 2026
Release: Dec 1, 2025
Close: Jan 7, 2026
Provide roadway and infrastructure improvements, will include the installation of water and sewer services, storm water ponds and drain system, curb and sidewalks, clearing and grubbing, maintenance of traffic throughout the project, and all other aspects. See outside link.
AvailableRelease: Nov 2, 2025
Close: Dec 17, 2025
Drainage Improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis