Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Fontana is soliciting bids for the VoH Liberty Loop Patching Pavement Rehabilitation Project, which includes pavement patching, ADA upgrades to curb access return ramps, and removal and replacement of curb & gutter at Liberty Parkway in the Village of Heritage Residential Neighborhood. This Invitation for Bid (DE-26-97-SB) is a lump-sum construction contract with bonding requirements, Davis-Bacon/prevailing wage compliance, and a Class A (or equivalent C specialties) contractor licensing requirement. Bids are due 2026-02-12 2:00 PM PST; contact: Elia Alvarez (909-350-6605, ealvarez@fontanaca.gov).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Pavement rehabilitation. Construction of pavement reconstruction, traffic control, and traffic striping.
Posted Date
Dec 23, 2025
Due Date
Jan 28, 2026
Release: Dec 23, 2025
Close: Jan 28, 2026
Pavement rehabilitation. Construction of pavement reconstruction, traffic control, and traffic striping.
AvailablePavement Rehabilitation, including grind and overlay of existing asphalt, removal and replacement of existing asphalt and concrete, and ADA upgrades to existing curb access return ramps.
Posted Date
Dec 19, 2025
Due Date
Jan 22, 2026
Release: Dec 19, 2025
Close: Jan 22, 2026
Pavement Rehabilitation, including grind and overlay of existing asphalt, removal and replacement of existing asphalt and concrete, and ADA upgrades to existing curb access return ramps.
AvailableThe City of King (King City), CA is soliciting bids for the 2025 CDBG Pavement Rehabilitation Project to perform pavement rehabilitation on several street segments, including digouts, adjustment of utility covers, cold planing, HMA leveling and surface courses, cape seal, striping, and markings. The project is funded by a Community Development Block Grant (CDBG) and must comply with applicable federal and state provisions, including prevailing wage and bonding requirements; contract time is 40 working days from notice to proceed. Bids were posted with an open date of 2025-12-22 and a close date of 2026-02-05 (the posting was last updated 2025-12-24), and contact for the bid is Octavio Hurtado (ohurtado@kingcity.com, 831-385-3281 ext 5927).
Posted Date
Dec 22, 2025
Due Date
Feb 5, 2026
Release: Dec 22, 2025
Close: Feb 5, 2026
The City of King (King City), CA is soliciting bids for the 2025 CDBG Pavement Rehabilitation Project to perform pavement rehabilitation on several street segments, including digouts, adjustment of utility covers, cold planing, HMA leveling and surface courses, cape seal, striping, and markings. The project is funded by a Community Development Block Grant (CDBG) and must comply with applicable federal and state provisions, including prevailing wage and bonding requirements; contract time is 40 working days from notice to proceed. Bids were posted with an open date of 2025-12-22 and a close date of 2026-02-05 (the posting was last updated 2025-12-24), and contact for the bid is Octavio Hurtado (ohurtado@kingcity.com, 831-385-3281 ext 5927).
Provide pavement patching (asphalt).
Posted Date
Dec 15, 2025
Due Date
Jan 21, 2026
Release: Dec 15, 2025
Close: Jan 21, 2026
Provide pavement patching (asphalt).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis