Summary
Work includes demolition of existing site elements, new site work, paving (hard surface) revisions, new building construction and additions, Work includes site Work and some Off-Site Work, Building "Modernizations" and existing site work to "modernize" baseball,
softball fields, and track, Construction elements include conventional reinforced cast-in-place concrete foundations, floor slabs. Exterior wood framing and wood siding. Site Work elements are required to accommodate the new building construction Work, Exterior doors are insulated aluminum assemblies or hollow metal door/frame
assemblies. Exterior windows are aluminum with glazing units with low-etempered glass, Interior building construction elements include gypsum board attached to wood framing. Interior doors are solid core wood doors in hollow metal frames, Interior finishes include painted walls and other surfaces, carpeting, resilient flooring, tile floors, vinyl wall fabric, and suspended acoustical ceilings, Specialties, equipment and furnishings include toilet accessories, cabinets and
accessories, signs and miscellaneous specialties, Mechanical Work includes plumbing systems and fixtures, heating and air
conditioning systems. Site mechanical Work includes service piping and lines for water and sanitary sewer, Electrical Work includes distribution systems, lighting fixtures, fire alarm Work, and data/phone Work, Site Work includes plumbing storm drainage systems, water system, earthwork for new improvements, concrete walkways asphalt paving and landscape and irrigation Work.