Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Complete a long-term viability study needed to evaluate the future of the Vine Street Water Treatment Plant (WTP). Study shall include analysis of the existing conditions at the WTP and other water systems as related to plant operations, and a cost benefit analysis comparing options to make improvements on site compared to decommissioning the WTP and constructing a new plant at an alternate site.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Albany seeks qualified consulting/engineering services to perform a viability study for the Vine Street Water Treatment Plant: existing-conditions assessment, alternatives analysis comparing on-site improvements versus decommissioning and building a new plant, cost–benefit and return-on-investment analysis, and evaluation of impacts to the associated hydroelectric facility and canal; selection is qualifications‑based (QBS) — do not include pricing in the proposal.
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
The City of Albany seeks qualified consulting/engineering services to perform a viability study for the Vine Street Water Treatment Plant: existing-conditions assessment, alternatives analysis comparing on-site improvements versus decommissioning and building a new plant, cost–benefit and return-on-investment analysis, and evaluation of impacts to the associated hydroelectric facility and canal; selection is qualifications‑based (QBS) — do not include pricing in the proposal.
AvailableEast vine street wall replacement.
Posted Date
Dec 10, 2025
Due Date
Jan 7, 2026
Release: Dec 10, 2025
Close: Jan 7, 2026
East vine street wall replacement.
AvailableIncludes installation of 8” sanitary sewer main and manholes, 12” water main, services, 18” storm sewer main and manholes, sidewalk, curb and gutter, street lighting, asphalt surface restoration, concrete surface restoration, and grass surface restoration.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Includes installation of 8” sanitary sewer main and manholes, 12” water main, services, 18” storm sewer main and manholes, sidewalk, curb and gutter, street lighting, asphalt surface restoration, concrete surface restoration, and grass surface restoration.
AvailableCreate a Capital Maintenance Plan (CMP) that covers the buildings, land, mechanical systems, electrical systems, plumbing and project proposals. The facility study is needed to develop a long-range, comprehensive CMP and to establish current facility project needs. The study shall provide an appraisal as to each facility’s ability to meet current and planned educational program needs. See attached file.
Posted Date
Nov 10, 2025
Due Date
Dec 11, 2025
Release: Nov 10, 2025
Close: Dec 11, 2025
Create a Capital Maintenance Plan (CMP) that covers the buildings, land, mechanical systems, electrical systems, plumbing and project proposals. The facility study is needed to develop a long-range, comprehensive CMP and to establish current facility project needs. The study shall provide an appraisal as to each facility’s ability to meet current and planned educational program needs. See attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis