Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction, development and testing of a permanent well at the proposed Well 5 site, including but not limited to, well drilling and test pumping, formation sampling, and associated site restoration, and other pertinent work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
Posted Date
Dec 10, 2025
Due Date
Jan 30, 2026
Premium
Access the largest public sector contact database
Release: Dec 10, 2025
Close: Jan 30, 2026
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
AvailableHighland City is soliciting bids for a construction contract to furnish and install chlorination equipment, electrical systems, and related facilities at two existing drinking water wells (Well #1 and Well #5) in Highland City, Utah. The work includes mobilization, piping modifications, installation of chlorination equipment and an electric actuator at Well #1, and construction of a 6 x 6 shed with required electrical and HVAC at both well sites. A pre-bid meeting is scheduled for 2025-12-16 and questions/submissions are to be submitted via the indicated procurement portal; submissions are due 2026-01-08 at 10:00 AM MT.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
Highland City is soliciting bids for a construction contract to furnish and install chlorination equipment, electrical systems, and related facilities at two existing drinking water wells (Well #1 and Well #5) in Highland City, Utah. The work includes mobilization, piping modifications, installation of chlorination equipment and an electric actuator at Well #1, and construction of a 6 x 6 shed with required electrical and HVAC at both well sites. A pre-bid meeting is scheduled for 2025-12-16 and questions/submissions are to be submitted via the indicated procurement portal; submissions are due 2026-01-08 at 10:00 AM MT.
AvailableThe project includes construction, test pumping, sampling and laboratory testing of two bedrock test wells.
Posted Date
Dec 4, 2025
Due Date
Dec 22, 2025
Release: Dec 4, 2025
Close: Dec 22, 2025
The project includes construction, test pumping, sampling and laboratory testing of two bedrock test wells.
AvailableProject includes demolition of the existing well house and construction of a new well house with a pump room and two chemical rooms.
Posted Date
Dec 4, 2025
Due Date
Jan 7, 2026
Release: Dec 4, 2025
Close: Jan 7, 2026
Project includes demolition of the existing well house and construction of a new well house with a pump room and two chemical rooms.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis