Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of the construction of the water treatment facility, improvements to the existing route 228 booster station and existing 400,000-gallon hollow water storage tank, and demolition and removal of the unused 200,000-gallon water storage tank.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes water treatment facility improvements (phase 2).
Posted Date
Jan 14, 2026
Due Date
Feb 12, 2026
Release: Jan 14, 2026
Close: Feb 12, 2026
Work includes water treatment facility improvements (phase 2).
AvailableThis RFP is for the construction of Phase II Water System Improvements.
Posted Date
Jan 15, 2026
Due Date
Feb 13, 2026
Release: Jan 15, 2026
Close: Feb 13, 2026
This RFP is for the construction of Phase II Water System Improvements.
AvailableWater system improvements.
Posted Date
Jan 23, 2026
Due Date
Feb 13, 2026
Release: Jan 23, 2026
Close: Feb 13, 2026
Water system improvements.
Available1A. Construction of a New water treatment plant, including two (2) 0.5 MGD membrane ultrafiltration skids, one clean-inplace sid, Chemical storage and metering system, two (2) finished water pumps and associated piping, valving, controls integration and start up. Construction of improvements to the existing taw water intake maintenance building, including two (2) raw water pumps, associated piping, valving, controls integration and start up. 1B. Construction of all electrical improvements. 1C. Construction of HVAC systems. 1D. Construction of all plumbing improvements.
Posted Date
Dec 16, 2025
Due Date
Feb 4, 2026
Release: Dec 16, 2025
Close: Feb 4, 2026
1A. Construction of a New water treatment plant, including two (2) 0.5 MGD membrane ultrafiltration skids, one clean-inplace sid, Chemical storage and metering system, two (2) finished water pumps and associated piping, valving, controls integration and start up. Construction of improvements to the existing taw water intake maintenance building, including two (2) raw water pumps, associated piping, valving, controls integration and start up. 1B. Construction of all electrical improvements. 1C. Construction of HVAC systems. 1D. Construction of all plumbing improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →