Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consists of replacing existing filter bank 1 wafer butterfly valves and pneumatic actuators with new AWWA flanged butterfly valves and pneumatic actuators, control wring and remote i/o panel and making piping modifications as required; providing new compressed air header in pipe gallery; tying in existing filter bank 2 pneumatic actuators to new air header; providing new south zone magnetic flow meter with electrical and signal wiring and associated piping changes; providing new raw water magnetic flow meter with electrical and signal wiring and associated piping changes, and miscellaneous ancillary work. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of flood damage meter replacement (meter installation). Work will involve the replacement of approx. 2500 5/8" x 3/4" residential meters throughout County. Specifically, those areas impacted by the 2022 flood.
Posted Date
Jan 21, 2026
Due Date
Feb 2, 2026
Release: Jan 21, 2026
Close: Feb 2, 2026
Construction of flood damage meter replacement (meter installation). Work will involve the replacement of approx. 2500 5/8" x 3/4" residential meters throughout County. Specifically, those areas impacted by the 2022 flood.
AvailableWork includes replacement of approximately 3,750+/- water meters, meter boxes, backflow preventers, curb stop, meter logging, water service line replacement, software, and multiple handheld devices.
Posted Date
Jan 9, 2026
Due Date
Feb 6, 2026
Release: Jan 9, 2026
Close: Feb 6, 2026
Work includes replacement of approximately 3,750+/- water meters, meter boxes, backflow preventers, curb stop, meter logging, water service line replacement, software, and multiple handheld devices.
AvailableThe project will involve the installation of approx 11 gate valves and 14 insertion valves, as well as the replacement of 21 gate valves. Work will include efforts in traffic control, sediment and erosion control, and surface restoration of disturbed roadways and driveways. Traffic control 1 ls, erosion and sediment control 1 ls, 4" gate valve replacement 6 ea, 6" gate valve replacement 13 ea, 8" gate valve replacement 1 ea, 10" gate valve replacement 1 ea, 4" gate valve installation 5 ea, 6" gate valve installation 6 ea, 10" insertion valve installation 6 ea, see attached file.
Posted Date
-
Due Date
Feb 25, 2026
Close: Feb 25, 2026
The project will involve the installation of approx 11 gate valves and 14 insertion valves, as well as the replacement of 21 gate valves. Work will include efforts in traffic control, sediment and erosion control, and surface restoration of disturbed roadways and driveways. Traffic control 1 ls, erosion and sediment control 1 ls, 4" gate valve replacement 6 ea, 6" gate valve replacement 13 ea, 8" gate valve replacement 1 ea, 10" gate valve replacement 1 ea, 4" gate valve installation 5 ea, 6" gate valve installation 6 ea, 10" insertion valve installation 6 ea, see attached file.
Release: Jan 25, 2026
Close: Mar 4, 2026
Pressure reducing valve replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis