Summary
Work include remove and properly dispose of all bulk trash, furniture and miscellaneous items in the unit and outside. Remove all existing appliances and range hood and dispose if needed. Install closet shelving/closet rod as necessary. Install interior handrail in stairwell of unit if needed. Final cleaning of entire unit to make ready for occupancy. Repair exterior concrete repairs if needed. Replace all angle stops and water shut off valves. Replace gas shut off valves. Replace all exterior lights. Repair or remove screen doors and hardware. Repair outside metal handrails if needed. Install 2ft high sheet metal or aluminum trim behind all base cabinets. See attached file.