Summary
Remove and properly dispose of all Bulk Trash, Furniture and Miscellaneous Items in the Unit and Outside. Remove all existing appliances and range hood and dispose if needed. Install closet shelving/closet rod as necessary. Install interior handrail in stairwell of unit if needed. Final Cleaning of Entire Unit to Make Ready for Occupancy. Power wash exterior if needed. Repair exterior concrete repairs. Replace all angle stops and water shut off valves. Replace gas shut off valves Replace all exterior lights. Repair or remove screen doors and hardware. Repair outside metal handrails if needed. Board up doors and windows ¾ plywood Scrape and caulk around all window frame and sills, Replace all stair treads Paint exterior railings.