Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The removal of the deteriorated V-Notch Weirs and installation of a new V-Notch Weirs supplied by the WRBP in Gravity Thickener #1 and (2) the removal of a Slide Gate Valve and the installation of a new one supplied by the WRBP in Channel #2 of the Headworks Building. This work will also require the repair of failed concrete on the Thickener and Headworks Channel #2. Since both Gravity Thickeners are in operation during summer and autumn months and due to solids loading limitations at the treatment plant, the Thickener will not be available for the V-Notch Weirs removal/installation until after February 1, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project includes: Schedule A – Biosolids Dewatering Facility; Schedule B – Gravity Thickener and Tunnel; Schedule C – Chemical Feed Unit (Bid Alternate); Schedule D – HVAC Upgrades and Roof Replacements;
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Close: Feb 5, 2026
The project includes: Schedule A – Biosolids Dewatering Facility; Schedule B – Gravity Thickener and Tunnel; Schedule C – Chemical Feed Unit (Bid Alternate); Schedule D – HVAC Upgrades and Roof Replacements;
AvailableOne-year contract for fence and gate installation services in Gordonsville, Tennessee.
Posted Date
Jan 9, 2026
Due Date
Feb 6, 2026
Release: Jan 9, 2026
Close: Feb 6, 2026
One-year contract for fence and gate installation services in Gordonsville, Tennessee.
AvailableWork include rehab the north wastewater reclamation facility biosolids gravity belt thickener system, rehabilitation of 1 gravity belt thickener, provide new two (2) independent master control panels and field instrumentation, rehab the south wastewater reclamation facility biosolids belt press system, rehabilitation of the belt filter press (one), provide one (1) new master control panel, remote control panel and field instrumentation.
Posted Date
Jan 29, 2026
Due Date
Feb 26, 2026
Release: Jan 29, 2026
Close: Feb 26, 2026
Work include rehab the north wastewater reclamation facility biosolids gravity belt thickener system, rehabilitation of 1 gravity belt thickener, provide new two (2) independent master control panels and field instrumentation, rehab the south wastewater reclamation facility biosolids belt press system, rehabilitation of the belt filter press (one), provide one (1) new master control panel, remote control panel and field instrumentation.
The U.S. Department of Veterans Affairs (VA) seeks a contractor to provide Schaefer Systems International (SSI) gravity flow shelving and installation services for the Denver Logistics Services warehouse at 1 Federal Center, Building 810, Denver, CO 80225. The work includes delivery and installation of 117 gravity flow racks (108 add-on shelves and 9 starter shelves) and related supplies, labor, tools, and documentation, with installation to be completed within 30 days of award. The contract will be awarded to the responsible quoter whose quotation is technically acceptable and has the lowest evaluated price.
Posted Date
Jan 26, 2026
Due Date
Feb 3, 2026
Release: Jan 26, 2026
Close: Feb 3, 2026
The U.S. Department of Veterans Affairs (VA) seeks a contractor to provide Schaefer Systems International (SSI) gravity flow shelving and installation services for the Denver Logistics Services warehouse at 1 Federal Center, Building 810, Denver, CO 80225. The work includes delivery and installation of 117 gravity flow racks (108 add-on shelves and 9 starter shelves) and related supplies, labor, tools, and documentation, with installation to be completed within 30 days of award. The contract will be awarded to the responsible quoter whose quotation is technically acceptable and has the lowest evaluated price.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis