Summary
Work includes approx. Two (2) new unloading hoppers (DT receiving hopper and center receiving hopper); a new conveyor (rail receiving belt) that will tie into an existing transfer tower; two (2) new unloading hoppers (DT outbound hopper and center outbound hopper) and loading zones for an existing conveyor (outbound belt 1); an engineered evaluation of the outbound belt 1 will be required, including an updated horsepower calculation to determine if the added loading zones require an updated drive system for the conveyor. The new equipment will be installed in a below-grade tunnel that is partially new and partially existing. The new equipment will be installed in an existing tunnel and conveyor.