Summary
The work of this Contract will include the removal of concrete and asphalt pavement, the removal of one (1), 8,000 Gallon gasoline UST system, one (1), 6,000 Gallon diesel fuel UST system, all fuel island features and the fuel island, soil remediation work, demolition and removal of the existing canopy structure, and other features from the south side of the Village Facility. The work will also include the installation of one (1), new, 12,000 Gallon double-wall FRP gasoline UST system, one (1), new, 8,000 Gallon double-wall FRP diesel fuel UST system, with new product piping and dispensers, new raised concrete fuel island, new fuel management system, new fuel island canopy, and other features.