Federal
Posted
Sep 21, 2026
Sep 30, 2027
USS LEWIS B PULLER -MTA -FY 27.
Mid-Term Availability (MTA) package for the USS LEWIS B PULLER for the Military Sealift Command (MSC). The package consists of ninety (120) work items (WI), including one (1) optional work item and seven (7) not separately priced (NSP) work items. The ship required Pire-side docking at the contractors facility . Technical drawings and specifications will be provided upon request after the solicitation has been issued. The work will be performed at the contractors facility located within Seventh Fleet AOR. The anticipated Period of Performance (POP) is from 1 June -16 July 2027.
