Summary
The contractor shall provide all required equipment, materials, and labor to perform the following aboard the CGC ISAAC MAYO: Set up protective measures to seal off and protect vessel components from contamination. Handle interferences such as GPS/Radio Antennas and Screen Panels. Remove and properly dispose of existing canvas covers and lacing. Conduct a visual inspection of awning support structures and mounting hardware, documenting and submitting any discrepancies. Clean awning piping, remove visible corrosion via chemical/mechanical methods, and coat the exposed aluminum with outdoor protectant. Install new, color-matched canvas awnings, tensioning them to ensure a tight application.