Closing soon

USACE SPK DBB Construction - LAR C3B South - Sacramento, CA

Description: Work will include excavating, placement, and regrading of material on the riverbank slope and levee embankment, installation of soil-filled rock slope protection on the waterside levee face and riverbank, soil and rock placement to construct river toe protection and planting bench features, instream wood structure placement on the planting benches, construction of buried launchable trench features in the overbank, tie-in of erosion protection elements to existing rock revetment features, providing temporary erosion control for stabilization of disturbed soil areas, and import and placement of riprap.

Released
Oct 1, 2026
Closes
Oct 20, 2026(6 days left)

Files

Original attachments and procurement documents tied to this bid.

Federal RFP files are for Starbridge customers only.

You can request RFP files from all other buyer types for free on this site.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts