Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
A requirement for Design-Bid-Build (DBB) construction services to build a new single-story, 5,000 square-foot (SF) Headquarters (HQ) building and a new single-story, 4,200 SF maintenance shop w/ storage mezzanine to support USACE administrative, ranger, and maintenance staff. The HQ building is anticipated to be metal-stud construction and will include management offices, open cubicle work areas, conference room, information center, communication, mechanical and electrical rooms, restrooms, nursing room, kitchen, storage room, and copy room. The maintenance shop is anticipated to be a pre-engineered metal building and will include maintenance bays, management office, open cubicle work areas, electrical room, restroom, locker room, kitchen, tool room, and storage mezzanine. Also located at the maintenance shop will be new pre-engineered metal buildings for the equipment and hazardous material sheds. The project is also anticipated to include the demolition and removal of two (2) existing buildings and three (3) shed structures, as well as new building construction, grading, utilities, oxidation pond relining, asphaltic concrete paving, sidewalks, curbs, fencing, and landscaping.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The renovation, modernization, and phased replacement of plating shop facilities. Demolition and replacement of existing plating line tanks and process equipment. Installation and commissioning of new electroplating, anodizing, cleaning, stripping, and surface treatment process lines. Installation of chemical distribution and storage systems. Mechanical, electrical, and control system upgrades supporting plating operations. Ventilation, air quality management, and environmental control systems. Fire suppression and life safety system upgrades. Structural modifications to support new process equipment. Construction of a new approximately 2,800-square-foot Pre-Engineered Metal Building (PEMB) to house relocated ovens and supporting equipment. Utility upgrades including process piping, compressed air, gases, power distribution, and controls.
Posted Date
Jan 22, 2026
Due Date
Mar 20, 2026
Release: Jan 22, 2026
Close: Mar 20, 2026
The renovation, modernization, and phased replacement of plating shop facilities. Demolition and replacement of existing plating line tanks and process equipment. Installation and commissioning of new electroplating, anodizing, cleaning, stripping, and surface treatment process lines. Installation of chemical distribution and storage systems. Mechanical, electrical, and control system upgrades supporting plating operations. Ventilation, air quality management, and environmental control systems. Fire suppression and life safety system upgrades. Structural modifications to support new process equipment. Construction of a new approximately 2,800-square-foot Pre-Engineered Metal Building (PEMB) to house relocated ovens and supporting equipment. Utility upgrades including process piping, compressed air, gases, power distribution, and controls.
AvailableProvide y810 maintenance building construction.
Posted Date
Nov 20, 2025
Due Date
Jan 29, 2026
Release: Nov 20, 2025
Close: Jan 29, 2026
Provide y810 maintenance building construction.
AvailablePark lake dam rehabilitation. Work includes but is not limited to; clearing and grubbing, dewatering of Park Lake, deconstruction of the existing dam, construction of a new dam, new seismic foundation, hydraulic seepage control, road reconstruction, reclamation, and all other work associated with dam rehabilitation and construction.
Posted Date
Jan 15, 2026
Due Date
Feb 16, 2026
Release: Jan 15, 2026
Close: Feb 16, 2026
Park lake dam rehabilitation. Work includes but is not limited to; clearing and grubbing, dewatering of Park Lake, deconstruction of the existing dam, construction of a new dam, new seismic foundation, hydraulic seepage control, road reconstruction, reclamation, and all other work associated with dam rehabilitation and construction.
Roof repairs (including framing, decking, shingles, metal, membrane, built-up, roof coatings, insulation, roof drains, gutters and downspouts); siding and trim installation and repairs; drywall and plaster repairs; interior and exterior painting. See attached file.
Posted Date
Jan 21, 2026
Due Date
Jan 28, 2026
Release: Jan 21, 2026
Close: Jan 28, 2026
Roof repairs (including framing, decking, shingles, metal, membrane, built-up, roof coatings, insulation, roof drains, gutters and downspouts); siding and trim installation and repairs; drywall and plaster repairs; interior and exterior painting. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis