Summary
The renovation, modernization, and phased replacement of plating shop facilities. Demolition and replacement of existing plating line tanks and process equipment. Installation and commissioning of new electroplating, anodizing, cleaning, stripping, and
surface treatment process lines. Installation of chemical distribution and storage systems. Mechanical, electrical, and control system upgrades supporting plating operations. Ventilation, air quality management, and environmental control systems. Fire suppression and life safety system upgrades. Structural modifications to support new process equipment. Construction of a new approximately 2,800-square-foot Pre-Engineered Metal Building (PEMB) to house relocated ovens and supporting equipment. Utility upgrades including process piping, compressed air, gases, power distribution, and controls.