Northville Central School District
School DistrictNY
Posted
Nov 18, 2026
Jan 2, 2027
Description: The district is soliciting proposals to install approximately 800 feet of 12‑strand single‑mode dark fiber from Windham Primary School to the Athletic Field and Physical Education Center, terminating at an existing switch in the press box. The required scope includes trenching, conduit, ground boxes every 400 feet, restoration of disturbed areas, fusion splicing into LC connectors with OTDR testing (no mechanical connectors), and provision of up to four LC fiber patch panels and up to eight 1M LC‑to‑LC patch cables. The district will accept self‑provisioned fiber proposals and will also consider leased lit or leased dark fiber options, evaluating cost effectiveness over a five‑year period; vendors are responsible for Dig Safe and must complete site visits by 2027-01-22.
SchoolDistrict · ME, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Windham Raymond School District 14.
Adjacent opportunities open for bidding right now.
Northville Central School District
School DistrictNY
Posted
Nov 18, 2026
Jan 2, 2027
The applicant is soliciting proposals for new E-Rate eligible Category 2 licenses (software/licenses) as specified in the Northville FY27 C2 Licenses Pricing Attachment, with offers accepted for the listed makes/models or documented equivalents. Equipment must be new, priced per unit/SKU with E-Rate eligibility percentages identified, and proposals must conform to the provided pricing attachment format and scope (partial offers are not allowed). The applicant prefers Service Provider Invoicing (SPI) and requires offerors to hold an active nine-digit SPIN as of the proposal submission deadline and to comply with applicable E-Rate rules and procurement preferences (including NYS OGS where applicable).
Yuba City Unified School District
School DistrictCA
Posted
Nov 18, 2026
Jan 25, 2027
The District is soliciting bids to furnish and install structured telecommunications cabling and associated infrastructure at five school sites as FY2027 E‑Rate Structured Cabling Projects, to be bid and awarded as three separate projects (Group 1: YCHS / Independence Academy / Bridge Street; Group 2: Andros Karperos; Group 3: Tierra Buena). The full scope of work, technical specifications, plans and site maps are described in Exhibit A and the applicable E‑Rate Form 470 attachments. Projects are public works subject to California prevailing wage, Department of Industrial Relations registration, required California contractor licensing (C-7 or C-10), and mandatory pre-bid site-walk attendance to be eligible to submit a bid.
Lakewood Local School District
School DistrictOH
Posted
Nov 16, 2026
Dec 23, 2026
Lakewood Local School District seeks proposals to install network cabling, patch panels, terminations, and related installation and testing to support wireless access point locations. The request covers up to 200 new Category 6A network runs (each no longer than 325 feet), termination at both ends, labeling, patch panels, testing/certification, and as-built documentation, with bidders required to use provided maps to estimate routes, lengths, and destination data closets. Proposals must include itemized materials and labor pricing (unit and per-foot), assumptions/exclusions, an installation schedule, references, confirmation of completion by 2027-08-31, and whether the vendor can support Service Provider Invoicing (SPI) and separate E‑Rate-eligible and ineligible costs.
School DistrictOK
Posted
Nov 16, 2026
Dec 29, 2026
Mangum Independent School District 1 is soliciting Category 2 internal connections network equipment and related services for E-Rate Funding Year 2027-28, including wireless access points, PoE+ managed switches, licensing options, warranties and installation. The procurement requests turnkey proposals that include all necessary hardware, cabling, optics, licenses, installation/configuration, and optional maintenance/managed internal broadband services (BMIC/MIBS). Vendors must price equipment, recurring and non-recurring charges, separate E-Rate eligible vs ineligible costs, and account for a presumed 25% tariff line item for manufacturer networking equipment manufactured abroad.