Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Little River Band of Ottawa Indians seeks proposals for US31 Sewer Upgrades, involving connection to an existing 8" forcemain and extension to a gravity sewer system. The project includes cutting, capping, and abandoning a section of forcemain.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Dec 22, 2025
Close: Jan 30, 2026
Sewer system upgrades.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes exterior sewer upgrades.
Posted Date
Nov 18, 2025
Due Date
Jan 14, 2026
Release: Nov 18, 2025
Close: Jan 14, 2026
Work includes exterior sewer upgrades.
AvailableFurnishing of labor, material and equipment entering into the construction of longleaf neuro-medical treatment center exterior sewer upgrades.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Furnishing of labor, material and equipment entering into the construction of longleaf neuro-medical treatment center exterior sewer upgrades.
AvailableWork includes approx. 1 LS clearing & grubbing, 1 EA 30" size tree removed, 61 CY aggregate base, 14 Gal non-tracking tack coat, 72 SF 4" concrete walk, 25 FT 4" conduit, 67 LF 6" CPSLP storm sewer, 5 EA storm sewer manhole, 40 LF 6" sanitary sewer lateral repair, 2,100 SY seeding and mulching, 2,500 EA erosion control, 26 CY cold patch asphalt.
Posted Date
Dec 15, 2025
Due Date
Jan 13, 2026
Release: Dec 15, 2025
Close: Jan 13, 2026
Work includes approx. 1 LS clearing & grubbing, 1 EA 30" size tree removed, 61 CY aggregate base, 14 Gal non-tracking tack coat, 72 SF 4" concrete walk, 25 FT 4" conduit, 67 LF 6" CPSLP storm sewer, 5 EA storm sewer manhole, 40 LF 6" sanitary sewer lateral repair, 2,100 SY seeding and mulching, 2,500 EA erosion control, 26 CY cold patch asphalt.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →