Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Washington Suburban Sanitary Commission (WSSC) is soliciting sealed bids for urgent repairs, rehabilitation, and replacement of water and wastewater assets throughout Prince George's and Montgomery Counties, Maryland. The contract is on an as-needed basis for repair, rehabilitation and replacement of mains, valves (<=30 in.), hydrants, sewer lining, manholes and related restoration, with rapid mobilization requirements and multiple awards anticipated.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Replacement and rehabilitation of water pipes, storm drains and sewers.
Posted Date
Nov 25, 2025
Due Date
Dec 23, 2025
Release: Nov 25, 2025
Close: Dec 23, 2025
Replacement and rehabilitation of water pipes, storm drains and sewers.
AvailableProvide wastewater treatment plant aeration basin rehabilitation and grit system replacement. The aeration basin air system requires a full rehabilitation. The scope of work includes: dewatering, removing and disposing the accumulated sludge, and cleaning all four cells of the aeration basin; complete replacement of all air distribution system in all four cells of the aeration basin. Once initial cleaning is complete, all remaining metal piping, fittings, and valves from the blowers to the new joints on the drop pipes in the aeration basin will be blast-cleaned and repainted. Due to the current inaccessibility of the filled cells, additional repairs to pedestals, tank walls, and floors may be required. See attached file.
Posted Date
Nov 19, 2025
Due Date
Dec 19, 2025
Release: Nov 19, 2025
Close: Dec 19, 2025
Provide wastewater treatment plant aeration basin rehabilitation and grit system replacement. The aeration basin air system requires a full rehabilitation. The scope of work includes: dewatering, removing and disposing the accumulated sludge, and cleaning all four cells of the aeration basin; complete replacement of all air distribution system in all four cells of the aeration basin. Once initial cleaning is complete, all remaining metal piping, fittings, and valves from the blowers to the new joints on the drop pipes in the aeration basin will be blast-cleaned and repainted. Due to the current inaccessibility of the filled cells, additional repairs to pedestals, tank walls, and floors may be required. See attached file.
AvailableProject consists of replacement and rehabilitation of water pipes, storm drains and sewers.
Posted Date
Nov 26, 2025
Due Date
Dec 23, 2025
Release: Nov 26, 2025
Close: Dec 23, 2025
Project consists of replacement and rehabilitation of water pipes, storm drains and sewers.
AvailableThe work consists of the replacement of approx. 6,000 LF of 8" and 12" waterline and approx. 5,700 LF of 8" wastewater pipe. Also includes 20,041 SY of surface milling; 708 SY of hot mix asphaltic concrete pavement, 3", type C; 19,333 SY of hot mix asphaltic concrete pavement, 2" type D; 144 LF of encasement pipe 16" dia. type 3/8" steel; see attached files.
Posted Date
Oct 20, 2025
Due Date
Dec 18, 2025
Release: Oct 20, 2025
Close: Dec 18, 2025
The work consists of the replacement of approx. 6,000 LF of 8" and 12" waterline and approx. 5,700 LF of 8" wastewater pipe. Also includes 20,041 SY of surface milling; 708 SY of hot mix asphaltic concrete pavement, 3", type C; 19,333 SY of hot mix asphaltic concrete pavement, 2" type D; 144 LF of encasement pipe 16" dia. type 3/8" steel; see attached files.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis