Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Loudon Water
Work includes removal and replacement of 24 manholes, 1 discharge vault, and various lengths and sizes of sanitary sewer pipe. The scope also includes traffic control, sheeting/shoring/bracing, and temporary bypass pumping.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Borough of Quarryville
Installation of approx. 2,730 LF of 8" Diameter CIPP liner, replacement and raising of 8 manhole frames and covers and the lining of 8 manholes with Sprayroq, by-pass pumping and restoration as shown on the map and as specified. Construction sequence provided hereinafter is general in nature and shall provide the basis of preparation of a detailed construction schedule by Contractor: 1.Install any by-pass pumping equipment. 2.Perform preinstallation cleaning and video documentation. 3. Install CIPP lining system. 4. Replace manhole frames and covers and raise manhole to existing ground surface. 5. Install any by-pass pumping and install Sprayroq lining system in manholes. 6. Site restoration.
Posted Date
Nov 4, 2025
Due Date
Dec 4, 2025
Release: Nov 4, 2025
Borough of Quarryville
Close: Dec 4, 2025
Installation of approx. 2,730 LF of 8" Diameter CIPP liner, replacement and raising of 8 manhole frames and covers and the lining of 8 manholes with Sprayroq, by-pass pumping and restoration as shown on the map and as specified. Construction sequence provided hereinafter is general in nature and shall provide the basis of preparation of a detailed construction schedule by Contractor: 1.Install any by-pass pumping equipment. 2.Perform preinstallation cleaning and video documentation. 3. Install CIPP lining system. 4. Replace manhole frames and covers and raise manhole to existing ground surface. 5. Install any by-pass pumping and install Sprayroq lining system in manholes. 6. Site restoration.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Township of Hamilton
Furnish and install approx. 100 LF of 18" diameter and 3,200 LF of 21" diameter PVC gravity sewer, installation/ replacement of 16 manholes, installation/replacement of a precast meter chamber, replacement and/or reconnection of associated sewer laterals, and other miscellaneous work.
Posted Date
Nov 6, 2025
Due Date
Dec 11, 2025
Release: Nov 6, 2025
Township of Hamilton
Close: Dec 11, 2025
Furnish and install approx. 100 LF of 18" diameter and 3,200 LF of 21" diameter PVC gravity sewer, installation/ replacement of 16 manholes, installation/replacement of a precast meter chamber, replacement and/or reconnection of associated sewer laterals, and other miscellaneous work.
AvailableEnglewood Cliffs School District
Project generally consists of replacement of the existing two rooftop mechanical units serving the upper gym. This work includes, but is not limited to the following: removal and disposal of existing rooftop units, ductwork, accessories, etc. New electric panels, distribution, and connections to existing. Installation of new hvac units including all duct and utility connects, controls, curbs, roof modifications, etc.
Posted Date
Nov 12, 2025
Due Date
Dec 9, 2025
Release: Nov 12, 2025
Englewood Cliffs School District
Close: Dec 9, 2025
Project generally consists of replacement of the existing two rooftop mechanical units serving the upper gym. This work includes, but is not limited to the following: removal and disposal of existing rooftop units, ductwork, accessories, etc. New electric panels, distribution, and connections to existing. Installation of new hvac units including all duct and utility connects, controls, curbs, roof modifications, etc.
AvailableCity of Spring Hill
Northeast interceptor sewer project.
Posted Date
Oct 22, 2025
Due Date
Dec 4, 2025
Release: Oct 22, 2025
City of Spring Hill
Close: Dec 4, 2025
Northeast interceptor sewer project.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →