Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of making upgrades to an existing sewer lift station include new submersible sewage pumps, appurtenances, and controls, a new wet well for additional storage capacity, and miscellaneous site upgrades. Additionally, upgrades will be made to existing sewer force mains including right-of-way and easement clearing, air release valve replacement, ice pigging, and point repairs.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Lift station upgrades work includes installing sanitary sewer system/lift station removing the park's septic tanks.
Posted Date
Jan 21, 2026
Due Date
Feb 24, 2026
Release: Jan 21, 2026
Close: Feb 24, 2026
Lift station upgrades work includes installing sanitary sewer system/lift station removing the park's septic tanks.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes replacing the existing sanitary sewer lift station, site work will include removal of existing package lift station, construction of a new submersible lift station, new gravity sewers, manholes and force main piping, paving, grading, seeding, and erosion control.
Posted Date
Jan 9, 2026
Due Date
Feb 25, 2026
Release: Jan 9, 2026
Close: Feb 25, 2026
Work includes replacing the existing sanitary sewer lift station, site work will include removal of existing package lift station, construction of a new submersible lift station, new gravity sewers, manholes and force main piping, paving, grading, seeding, and erosion control.
AvailableThe project will consist of upgrades to the existing lift station at the West Jessamine High School site. The upgrades will include replacement of (1) existing manhole with new manhole, reconnection of existing sanitary lines to manhole, replacement of the existing 4" sanitary pipe from manhole to wet well of lift station with new 8" sanitary from manhole to wet well, providing new data rack, new control integration of lift station pump system to district Building Automation System, and installation of new storm drainage consisting of new storm drain outlets, piping, trenching, and patching of asphalt drive.
Posted Date
Sep 26, 2025
Due Date
Feb 12, 2026
Release: Sep 26, 2025
Close: Feb 12, 2026
The project will consist of upgrades to the existing lift station at the West Jessamine High School site. The upgrades will include replacement of (1) existing manhole with new manhole, reconnection of existing sanitary lines to manhole, replacement of the existing 4" sanitary pipe from manhole to wet well of lift station with new 8" sanitary from manhole to wet well, providing new data rack, new control integration of lift station pump system to district Building Automation System, and installation of new storm drainage consisting of new storm drain outlets, piping, trenching, and patching of asphalt drive.
AvailableLift station modifications & pump improvements. Emergency generator and new concrete slab. Electrical and SCADA upgrades.
Posted Date
Dec 7, 2025
Due Date
Jan 27, 2026
Release: Dec 7, 2025
Close: Jan 27, 2026
Lift station modifications & pump improvements. Emergency generator and new concrete slab. Electrical and SCADA upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →