Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Defense Logistics Agency Land and Maritime issued a pre-solicitation for the Upgrade Tank Commander's Panel (UTCP) to procure 41 units (with 100% options) for the Abrams family of vehicles. The procurement is source-controlled and restricted to the primary qualified source General Dynamics Mission Systems-Canada (CAGE Code: 05257) or authorized distributors; only approved sources will be considered. Sources-sought responses are due January 31, 2026, with formal offer date anticipated approximately March 6, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide upgrade tank commander's panel. NSN: 1290015119539 Part Number: 12473169 (305004-901/05257/3/2). Basic Quantity: 41 (100% options).
Posted Date
Dec 31, 2025
Due Date
Jan 31, 2026
Release: Dec 31, 2025
Close: Jan 31, 2026
Provide upgrade tank commander's panel. NSN: 1290015119539 Part Number: 12473169 (305004-901/05257/3/2). Basic Quantity: 41 (100% options).
AvailableWork consists of security control panel upgrade project.
Posted Date
Jan 23, 2026
Due Date
Feb 18, 2026
Release: Jan 23, 2026
Close: Feb 18, 2026
Work consists of security control panel upgrade project.
AvailableProvide construction services for PEP panel and System upgrades to aging PEP systems. Remove and replace the following components from the existing PEP system: Pump and discharge piping within the tank: All floats. All associated low-voltage and high-voltage wiring. Existing electrical panel. Interior tank splice box. Transport all removed components to the City Utility site for disposal (no off-site disposal allowed). Install and anchor a new City-supplied PEP electrical control panel on the exterior of the residence. Repair minor stucco damage when caused during panel removal or installation. Installation of PEP pump and Panel: Ensure panel installation meets electrical code requirements and City Utility standards. Confirm generator adapter compatibility and ensure unobstructed access for Utility personnel. Install the City-supplied pump and plumb discharge piping to match existing configuration within the tank. Install new floats and wiring as required. Run new double-insulated wiring through the existing ¾” conduit using fish tape. Connect all electrical components into the new panel and ensure proper labeling.
Posted Date
Jan 21, 2026
Due Date
Feb 19, 2026
Release: Jan 21, 2026
Close:
Camino Real Regional Utility Authority (CRRUA) is procuring a sole-source control panel upgrade (Procurement No. 60-O0982-26-CP012) to replace/replicate Tonka Water filter system control panels at its Sunland Park (and Santa Teresa) water treatment facilities. The purchase is sole-source from Kurita America Inc., includes supply of a new 60" x 36" control panel, Allen Bradley PanelView Plus 7 (19") operator terminal, CompactLogix PLC, SCADA Ethernet switch, preloaded custom program and remote access via MGuard, and allows optional adders; period of performance begins 2026-02-16. The solicitation was posted 2026-01-20 and is open with a response deadline of 2026-02-19; the estimated amount listed is $178,432.30.
Posted Date
Jan 20, 2026
Due Date
Feb 19, 2026
Release: Jan 20, 2026
Close: Feb 19, 2026
Camino Real Regional Utility Authority (CRRUA) is procuring a sole-source control panel upgrade (Procurement No. 60-O0982-26-CP012) to replace/replicate Tonka Water filter system control panels at its Sunland Park (and Santa Teresa) water treatment facilities. The purchase is sole-source from Kurita America Inc., includes supply of a new 60" x 36" control panel, Allen Bradley PanelView Plus 7 (19") operator terminal, CompactLogix PLC, SCADA Ethernet switch, preloaded custom program and remote access via MGuard, and allows optional adders; period of performance begins 2026-02-16. The solicitation was posted 2026-01-20 and is open with a response deadline of 2026-02-19; the estimated amount listed is $178,432.30.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide construction services for PEP panel and System upgrades to aging PEP systems. Remove and replace the following components from the existing PEP system: Pump and discharge piping within the tank: All floats. All associated low-voltage and high-voltage wiring. Existing electrical panel. Interior tank splice box. Transport all removed components to the City Utility site for disposal (no off-site disposal allowed). Install and anchor a new City-supplied PEP electrical control panel on the exterior of the residence. Repair minor stucco damage when caused during panel removal or installation. Installation of PEP pump and Panel: Ensure panel installation meets electrical code requirements and City Utility standards. Confirm generator adapter compatibility and ensure unobstructed access for Utility personnel. Install the City-supplied pump and plumb discharge piping to match existing configuration within the tank. Install new floats and wiring as required. Run new double-insulated wiring through the existing ¾” conduit using fish tape. Connect all electrical components into the new panel and ensure proper labeling.
Available