Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The University of Nevada, Reno (UNR), via BCN Purchasing, issued ITB 9066 for the installation of two split air conditioning units in the lobby and an adjacent room at Juniper Hall (prevailing wage project) with an estimated cost between $140,000 and $240,000. Bids must be submitted electronically via the NGEM system (physical documents will not be accepted); the solicitation closes December 30, 2025 at 2:00 PM Pacific Time and the question cut-off and job walk dates are shown on the buyer site. Work is scheduled to begin January 13, 2026 and be complete by May 1, 2026, and required insurance, bonds, and standard UNR construction contract terms are specified in the attachments.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide HVAC supplies, includes Actuator, #VA-7150-1001; Actuator, Electric Valve, Proportional Non-Spring Return, 35 lb-in, JCI #VA9104-GGA-2S; 24V Normally Closed PopTop Actuator w/ 6" Motor Wires HONE 40003916-048 #HKZ1294520; Relief Valve, CASH ACME EB45 Series 3 13/32"L Bronze Pressure Regulator, 10 to 70 psi #31LH28; Drain Valve, Timed Electronic 115 Volt 1/4" Drain 100-120 Volt Max PSI 250 #13X524; Pneumatic Auto Drain Float Wilkerson GRP-95973 #6B251; Copper Pipe,3/4 OD Type ACR 5/8L Nitrogenized 20FT; Copper Tube, 7/8 OD, 3/4 ID Type L Nitrogenized. 20ft Lengths; Beli Screw Kit, Beli ZG-M4 TR-TF-LR-LF-AR-AFR-AF #Beli ZG-M4; Thermostat Kit, Pneumatic, Direct acting #T-4002-301.
Posted Date
Dec 4, 2025
Due Date
Dec 18, 2025
Release: Dec 4, 2025
Close: Dec 18, 2025
Provide HVAC supplies, includes Actuator, #VA-7150-1001; Actuator, Electric Valve, Proportional Non-Spring Return, 35 lb-in, JCI #VA9104-GGA-2S; 24V Normally Closed PopTop Actuator w/ 6" Motor Wires HONE 40003916-048 #HKZ1294520; Relief Valve, CASH ACME EB45 Series 3 13/32"L Bronze Pressure Regulator, 10 to 70 psi #31LH28; Drain Valve, Timed Electronic 115 Volt 1/4" Drain 100-120 Volt Max PSI 250 #13X524; Pneumatic Auto Drain Float Wilkerson GRP-95973 #6B251; Copper Pipe,3/4 OD Type ACR 5/8L Nitrogenized 20FT; Copper Tube, 7/8 OD, 3/4 ID Type L Nitrogenized. 20ft Lengths; Beli Screw Kit, Beli ZG-M4 TR-TF-LR-LF-AR-AFR-AF #Beli ZG-M4; Thermostat Kit, Pneumatic, Direct acting #T-4002-301.
AvailableProvide HVAC supplies, includes Actuator, #VA-7150-1001; Actuator, Electric Valve, Proportional Non-Spring Return, 35 lb-in, JCI #VA9104-GGA-2S; 24V Normally Closed PopTop Actuator w/ 6" Motor Wires HONE 40003916-048 #HKZ1294520; Relief Valve, CASH ACME EB45 Series 3 13/32"L Bronze Pressure Regulator, 10 to 70 psi #31LH28; Drain Valve, Timed Electronic 115 Volt 1/4" Drain 100-120 Volt Max PSI 250 #13X524; Pneumatic Auto Drain Float Wilkerson GRP-95973 #6B251; Copper Pipe,3/4 OD Type ACR 5/8L Nitrogenized 20FT; Copper Tube, 7/8 OD, 3/4 ID Type L Nitrogenized. 20ft Lengths; Beli Screw Kit, Beli ZG-M4 TR-TF-LR-LF-AR-AFR-AF #Beli ZG-M4; Thermostat Kit, Pneumatic, Direct acting #T-4002-301.
Posted Date
Dec 4, 2025
Due Date
Dec 18, 2025
Release: Dec 4, 2025
Close: Dec 18, 2025
Provide HVAC supplies, includes Actuator, #VA-7150-1001; Actuator, Electric Valve, Proportional Non-Spring Return, 35 lb-in, JCI #VA9104-GGA-2S; 24V Normally Closed PopTop Actuator w/ 6" Motor Wires HONE 40003916-048 #HKZ1294520; Relief Valve, CASH ACME EB45 Series 3 13/32"L Bronze Pressure Regulator, 10 to 70 psi #31LH28; Drain Valve, Timed Electronic 115 Volt 1/4" Drain 100-120 Volt Max PSI 250 #13X524; Pneumatic Auto Drain Float Wilkerson GRP-95973 #6B251; Copper Pipe,3/4 OD Type ACR 5/8L Nitrogenized 20FT; Copper Tube, 7/8 OD, 3/4 ID Type L Nitrogenized. 20ft Lengths; Beli Screw Kit, Beli ZG-M4 TR-TF-LR-LF-AR-AFR-AF #Beli ZG-M4; Thermostat Kit, Pneumatic, Direct acting #T-4002-301.
Interior renovation of holmes hall rooms, painting, installing floor sealer, spray fireproofing, patching and repairing walls and surfaces, installing a pipe railing gate and fence at 140c, and all necessary structural, plumbing, mechanical and electrical work, and hazardous material abatement.
Posted Date
Nov 17, 2025
Due Date
Dec 16, 2025
Release: Nov 17, 2025
Close: Dec 16, 2025
Interior renovation of holmes hall rooms, painting, installing floor sealer, spray fireproofing, patching and repairing walls and surfaces, installing a pipe railing gate and fence at 140c, and all necessary structural, plumbing, mechanical and electrical work, and hazardous material abatement.
AvailableHamilton Hall Boiler and Associated Asbestos Abatement - CR12 HVAC.
Posted Date
Dec 2, 2025
Due Date
Jan 8, 2026
Release: Dec 2, 2025
Close: Jan 8, 2026
Hamilton Hall Boiler and Associated Asbestos Abatement - CR12 HVAC.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis