Summary
onstruction. UFWL Floorplan A Primary Facility (7,321 SF).” Construct an approx. 7,321 SF Unmanned Fusion Warfare Laboratory (UFWL) building, with vestibule, offices, administration,
laboratory, secure vestibule, secure server, secure laboratory, secure collaboration, badging, breakroom/lobby, restrooms, janitorial, mechanical, electrical, and communications rooms, and all associated utilities within a line 5 feet of the facility as indicated on the drawings and per specifications. The work includes a fully complete and usable facility. The prime contractor is also responsible for all civil, structural, electrical, mechanical, and other incidental work necessary to support the installation of all other appurtenances in accordance with the AE provided construction drawings. See attached file.