Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnish and install unit 9 plant battery replacements and unit 9a gas turbine battery replacements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Removal and replacement of existing unit ventilators with new, including new A/C with condensers at County Technical School.
Posted Date
Dec 14, 2025
Due Date
Jan 15, 2026
Release: Dec 14, 2025
Close: Jan 15, 2026
Removal and replacement of existing unit ventilators with new, including new A/C with condensers at County Technical School.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove the existing layer of PVC Single Ply membrane and existing layer of 3/8” Fanfold recover board, exposing the original BUR: Granular-Surfaced roof assembly. Overlay of the existing original BUR: Granular-Surfaced roof assembly, via mechanical attachment of a 3/8” Fanfold recover board and mechanical attachment of a 50 MIL PVC single ply membrane. PVC Membrane: Contractor shall furnish and install, via mechanical attachment, a white, 50 mil single-ply membrane roofing system that is fabricated of a weft inserted, low-shrink, anti-wicking polyester fabric and has a thermoplastic coating of PVC material laminated to both sides.
Posted Date
Dec 10, 2025
Due Date
Jan 12, 2026
Release: Dec 10, 2025
Close: Jan 12, 2026
Remove the existing layer of PVC Single Ply membrane and existing layer of 3/8” Fanfold recover board, exposing the original BUR: Granular-Surfaced roof assembly. Overlay of the existing original BUR: Granular-Surfaced roof assembly, via mechanical attachment of a 3/8” Fanfold recover board and mechanical attachment of a 50 MIL PVC single ply membrane. PVC Membrane: Contractor shall furnish and install, via mechanical attachment, a white, 50 mil single-ply membrane roofing system that is fabricated of a weft inserted, low-shrink, anti-wicking polyester fabric and has a thermoplastic coating of PVC material laminated to both sides.
AvailableRemove the existing layer of PVC Single Ply membrane and existing layer of 3/8” Fanfold recover board, exposing the original BUR: Granular-Surfaced roof assembly. Overlay of the existing original BUR: Granular-Surfaced roof assembly, via mechanical attachment of a 3/8” Fanfold recover board and mechanical attachment of a 50 MIL PVC single ply membrane. PVC Membrane: Contractor shall furnish and install, via mechanical attachment, a white, 50 mil single-ply membrane roofing system that is fabricated of a weft inserted, low-shrink, anti-wicking polyester fabric and has a thermoplastic coating of PVC material laminated to both sides.
Posted Date
Dec 10, 2025
Due Date
Jan 12, 2026
Release: Dec 10, 2025
Close: Jan 12, 2026
Remove the existing layer of PVC Single Ply membrane and existing layer of 3/8” Fanfold recover board, exposing the original BUR: Granular-Surfaced roof assembly. Overlay of the existing original BUR: Granular-Surfaced roof assembly, via mechanical attachment of a 3/8” Fanfold recover board and mechanical attachment of a 50 MIL PVC single ply membrane. PVC Membrane: Contractor shall furnish and install, via mechanical attachment, a white, 50 mil single-ply membrane roofing system that is fabricated of a weft inserted, low-shrink, anti-wicking polyester fabric and has a thermoplastic coating of PVC material laminated to both sides.
AvailableDoor replacements.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
Door replacements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →