Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design-build services are sought for the removal of existing natural grass fields and installation of artificial turf fields at Union Pines High School and North Moore High School.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes stadium synthetic turf field replacement.
Posted Date
Dec 24, 2025
Due Date
Jan 27, 2026
Release: Dec 24, 2025
Close: Jan 27, 2026
Work includes stadium synthetic turf field replacement.
AvailableProject consists of synthetic turf softball field improvements and soccer field lighting.
Posted Date
Dec 31, 2025
Due Date
Jan 21, 2026
Release: Dec 31, 2025
Close: Jan 21, 2026
Project consists of synthetic turf softball field improvements and soccer field lighting.
AvailableThe purpose of this study was to provide geotechnical engineering information for the design of the proposed new synthetic turf field at the existing High School campus. The recommendations developed for this report are based on project information supplied.
Posted Date
Jan 6, 2026
Due Date
Jan 13, 2026
Release: Jan 6, 2026
Close: Jan 13, 2026
The purpose of this study was to provide geotechnical engineering information for the design of the proposed new synthetic turf field at the existing High School campus. The recommendations developed for this report are based on project information supplied.
AvailableThe City of Wauwatosa is requesting proposals to replace the synthetic turf field at Hart Park’s athletic stadium. The project follows 2025 flooding, with the turf and shock pad already removed; limited repairs to subbase stone and drains are required, and the new system must include a shock pad and meet current safety and performance standards. Work is desired as soon as possible in 2026, with completion no later than May 8, 2026, and weekday work limited after 4:00 PM starting March 30 to accommodate high school track practice.
Posted Date
Dec 17, 2025
Due Date
Jan 12, 2026
Release: Dec 17, 2025
Close: Jan 12, 2026
The City of Wauwatosa is requesting proposals to replace the synthetic turf field at Hart Park’s athletic stadium. The project follows 2025 flooding, with the turf and shock pad already removed; limited repairs to subbase stone and drains are required, and the new system must include a shock pad and meet current safety and performance standards. Work is desired as soon as possible in 2026, with completion no later than May 8, 2026, and weekday work limited after 4:00 PM starting March 30 to accommodate high school track practice.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis