Summary
Project consists of the enabling projects necessary to begin the construction of the ULL Health Care Education & Training Facility. 1) Demolition and replacement of the existing coulee lid cover as indicated in the "UL HEALTH COULEE CHECK SET 042026" drawing set.
2) Demolition of the existing corridor between Building 601 & the Imaging Center as indicated in the "Demo of 601 Connector" drawing set. Remove of corridor foundations and regrading of this area to be included. 3) Installation of access drive & laydown as indicated on the "HL Health 2D Logistics" plan. Extend stone drive around laydown yard and connect back to St. Landry St. - 8" Stone on geogrid & fabric to make Heavy Duty Paving subbase. Included stone on fabric for laydown yard.