Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes the demolition of (2) existing Vista chemistry analyzers and replacing them with (1) new Roche Cobas pro and (1) new Roche Cobas Pure Chemistry Analyzer in the existing operational Laboratory on the 2nd Floor of UCLA West Valley Medical Center. The University will furnish the (2) new Roche Cobas chemical analyzer equipment for Contractor to install. The improvements required include modifications to existing building electrical upgrades, plumbing and mechanical systems.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement for the demolition of existing lab analyzers and installation of new Roche Cobas chemistry analyzers, including electrical, plumbing, mechanical system modifications, new above-ceiling fan coil installation, and asbestos-containing material abatement at UCLA West Valley Medical Center.
Posted Date
Jan 13, 2026
Due Date
Feb 17, 2026
Release: Jan 13, 2026
Close: Feb 17, 2026
Procurement for the demolition of existing lab analyzers and installation of new Roche Cobas chemistry analyzers, including electrical, plumbing, mechanical system modifications, new above-ceiling fan coil installation, and asbestos-containing material abatement at UCLA West Valley Medical Center.
AvailableUCLA Health seeks up to four Executive Mechanical, Electrical, and Plumbing (MEP) engineering firms to provide full design services for multiple infrastructure equipment replacement projects identified in the UCLA Health Facilities Equipment Replacement Master Plan (Project CP1680). The work spans various UCLA Health facilities in Westwood, Santa Monica, West Valley, and other locations, and includes schematic design through construction administration. The RFQ packet is available via the UCLA Planroom beginning January 12, 2026, with questions due January 20, 2026 and responses due by 10:00 AM PST on February 3, 2026.
Posted Date
Jan 12, 2026
Due Date
Feb 3, 2026
Release: Jan 12, 2026
Close: Feb 3, 2026
UCLA Health seeks up to four Executive Mechanical, Electrical, and Plumbing (MEP) engineering firms to provide full design services for multiple infrastructure equipment replacement projects identified in the UCLA Health Facilities Equipment Replacement Master Plan (Project CP1680). The work spans various UCLA Health facilities in Westwood, Santa Monica, West Valley, and other locations, and includes schematic design through construction administration. The RFQ packet is available via the UCLA Planroom beginning January 12, 2026, with questions due January 20, 2026 and responses due by 10:00 AM PST on February 3, 2026.
The Alinity I Always on 2nd Day service agreement will cover the Alinity I Analyzer instrument including all repairs, replacements, and labor incur by instrument failures.
Posted Date
Jan 13, 2026
Due Date
Jan 26, 2026
Release: Jan 13, 2026
Close: Jan 26, 2026
The Alinity I Always on 2nd Day service agreement will cover the Alinity I Analyzer instrument including all repairs, replacements, and labor incur by instrument failures.
Floor Replacement for Main Gym.
Posted Date
Jan 16, 2026
Due Date
Feb 18, 2026
Release: Jan 16, 2026
Close: Feb 18, 2026
Floor Replacement for Main Gym.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis