Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide fiber and cable installation for the data center consolidation project. .
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Chapel audio system fiber integration: An output of the existing Chapel audio system will connect to a new network encoder, provided by the contractor, which will terminate to a new wall mount network switch, provided by the contractor, located at the existing fiber termination point within the building. (Technicians will be required to install new CAT6 cable between audio system’s new encoder and fiber termination point for the switch interconnection.) Once wiring and both devices are in place a fiber port on the new network switch will need to be patched to the existing facility fiber within the Chapel building for transmission to building 3 via the existing fiber network. Chapel new video camera and integration: Contractor shall provide and install a new HD PoE network camera to replace the current Chapel video broadcast camera and will integrate with the above network switch via a Cat 6 cable run to the switch located at the fiber termination panel within the building. See attached file.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Chapel audio system fiber integration: An output of the existing Chapel audio system will connect to a new network encoder, provided by the contractor, which will terminate to a new wall mount network switch, provided by the contractor, located at the existing fiber termination point within the building. (Technicians will be required to install new CAT6 cable between audio system’s new encoder and fiber termination point for the switch interconnection.) Once wiring and both devices are in place a fiber port on the new network switch will need to be patched to the existing facility fiber within the Chapel building for transmission to building 3 via the existing fiber network. Chapel new video camera and integration: Contractor shall provide and install a new HD PoE network camera to replace the current Chapel video broadcast camera and will integrate with the above network switch via a Cat 6 cable run to the switch located at the fiber termination panel within the building. See attached file.
AvailableFiber Optic Cable Installation, Termination, and Splicing Nextstep Transitions.
Posted Date
Dec 12, 2025
Due Date
Jan 14, 2026
Release: Dec 12, 2025
Close: Jan 14, 2026
Fiber Optic Cable Installation, Termination, and Splicing Nextstep Transitions.
AvailableProvide cable installation. The contractor shall provide personnel/labor for Outside and Inside Plant cable installation, surveys, and maintenance.
Posted Date
Dec 8, 2025
Due Date
Dec 16, 2025
Release: Dec 8, 2025
Close: Dec 16, 2025
Provide cable installation. The contractor shall provide personnel/labor for Outside and Inside Plant cable installation, surveys, and maintenance.
AvailableProvide Consolidation - HTME with Extended Installation Services (Includes Turnkey Services).
Posted Date
Oct 30, 2025
Due Date
Mar 11, 2026
Release: Oct 30, 2025
Close: Mar 11, 2026
Provide Consolidation - HTME with Extended Installation Services (Includes Turnkey Services).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis