Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnish and install one new water well including drilling and casing, installion of well pump and motor, concrete well pad, well discharge piping, plant piping, chlorination facilities, electrical work and all associated appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Pilot Hole No. 1 - (a) Mobilization. Includes surface casing (if Necessary) and preparing well site for drilling and all necessary equipment/appurtenances associated with construction activities. Contractor can spread cuttings on the project site; (b) Drilling 810 feet of 8 3/4" diameter borehole and collecting formation samples at 20' intervals, bagged and labeled; (c) Set of geophysical logs consisting of one (1) triple combo log and one (1) spectral ray log; (d) All incidentals necessary to complete the work, see outside link.
Posted Date
-
Due Date
Feb 3, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pilot Hole No. 1 - (a) Mobilization. Includes surface casing (if Necessary) and preparing well site for drilling and all necessary equipment/appurtenances associated with construction activities. Contractor can spread cuttings on the project site; (b) Drilling 810 feet of 8 3/4" diameter borehole and collecting formation samples at 20' intervals, bagged and labeled; (c) Set of geophysical logs consisting of one (1) triple combo log and one (1) spectral ray log; (d) All incidentals necessary to complete the work, see outside link.
AvailableThe City of Vancouver, Washington is rebidding an Invitation to Bid to refurbish the City Hall’s ground source heat pump (GSHP) system, including recovery and replacement of three well pumps, realignment of GSHP piping, new penthouse pumps, and updated valving. Contractors must coordinate with City-provided temporary heating and cooling to maintain indoor conditions. The work must be physically complete within 180 working days from Notice to Proceed, with a final physical completion no later than October 31, 2026.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
The City of Vancouver, Washington is rebidding an Invitation to Bid to refurbish the City Hall’s ground source heat pump (GSHP) system, including recovery and replacement of three well pumps, realignment of GSHP piping, new penthouse pumps, and updated valving. Contractors must coordinate with City-provided temporary heating and cooling to maintain indoor conditions. The work must be physically complete within 180 working days from Notice to Proceed, with a final physical completion no later than October 31, 2026.
AvailableRFP for well-drilling services to construct two monitoring wells for groundwater level monitoring.
Posted Date
Jan 12, 2026
Due Date
Feb 18, 2026
Release: Jan 12, 2026
Close: Feb 18, 2026
RFP for well-drilling services to construct two monitoring wells for groundwater level monitoring.
AvailableThe State of South Carolina (SCDES) is soliciting a certified well driller to construct one groundwater monitoring well at the St. John Recreation Complex in Cameron, Calhoun County, with drilling to approximately 765 feet and extended to 800 feet for geophysical logs and cuttings. The work requires mud rotary drilling with an 8-inch borehole, 4-inch Schedule-40 galvanized steel casing, a 4-inch stainless steel well screen, compliance with South Carolina Well Standards R.61-71, and completion/invoicing by June 30, 2026. Bids are due February 18, 2026 (deadline listed on the posting) and award will be by sealed competitive bidding to the lowest responsible and responsive bidder.
Posted Date
Jan 13, 2026
Due Date
Feb 18, 2026
Release: Jan 13, 2026
Close: Feb 18, 2026
The State of South Carolina (SCDES) is soliciting a certified well driller to construct one groundwater monitoring well at the St. John Recreation Complex in Cameron, Calhoun County, with drilling to approximately 765 feet and extended to 800 feet for geophysical logs and cuttings. The work requires mud rotary drilling with an 8-inch borehole, 4-inch Schedule-40 galvanized steel casing, a 4-inch stainless steel well screen, compliance with South Carolina Well Standards R.61-71, and completion/invoicing by June 30, 2026. Bids are due February 18, 2026 (deadline listed on the posting) and award will be by sealed competitive bidding to the lowest responsible and responsive bidder.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →