Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Falls County, on behalf of the Chilton Water Supply and Sewer Service Corporation, is soliciting bids for TxCDBG Project No. CDV23-0043 to install a generator for a lift station and perform wastewater treatment facility improvements in Chilton, Texas. Bids are due at 10:00 AM CST on January 30, 2026 at the Chilton Volunteer Fire Department, with a non-mandatory pre-bid meeting at the wastewater treatment plant on January 16, 2026. Bid documents are available via CivCast at no charge, and the project is subject to Davis-Bacon and Build America, Buy America requirements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Installation of generator for lift station and wastewater treatment plant improvements.
Posted Date
Jan 7, 2026
Due Date
Jan 30, 2026
Release: Jan 7, 2026
Close: Jan 30, 2026
Installation of generator for lift station and wastewater treatment plant improvements.
AvailableProcurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Procurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
AvailableProcurement for two contracts: Sanitary Sewer System Improvements (Phase I: investigation including video inspection and manhole work; Phase II: construction including CIPP, pipebursting, and manhole rehabilitation) and Wastewater Treatment Facility Improvements (installation of mechanical micro bar screen, biofiltration, UV disinfection, sludge de-watering, lift station rehabilitation, stationary generator, electrical & control improvements, and sludge retention basin construction).
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Procurement for two contracts: Sanitary Sewer System Improvements (Phase I: investigation including video inspection and manhole work; Phase II: construction including CIPP, pipebursting, and manhole rehabilitation) and Wastewater Treatment Facility Improvements (installation of mechanical micro bar screen, biofiltration, UV disinfection, sludge de-watering, lift station rehabilitation, stationary generator, electrical & control improvements, and sludge retention basin construction).
Work includes demolition of existing duplex submersible lift station, construction of complete duplex submersible lift station, including wet well, valve, chamber, sanitary sewer, force main, bypass connection, permanent standby generator, pumps, piping, valves, electrical, controls, and instrumentation; demolition of six (6) existing control structures, demolition of sixteen (16) existing gates, demolition (removal or flow fill) of approx 1,940 LF of transfer piping, installation of six (6) control structures, installation of approx 2,060 LF of transfer piping, installation of nineteen (19) gate valves and one (1) slide gate in control structures. See attached file.
Posted Date
Dec 17, 2025
Due Date
Jan 20, 2026
Release: Dec 17, 2025
Close: Jan 20, 2026
Work includes demolition of existing duplex submersible lift station, construction of complete duplex submersible lift station, including wet well, valve, chamber, sanitary sewer, force main, bypass connection, permanent standby generator, pumps, piping, valves, electrical, controls, and instrumentation; demolition of six (6) existing control structures, demolition of sixteen (16) existing gates, demolition (removal or flow fill) of approx 1,940 LF of transfer piping, installation of six (6) control structures, installation of approx 2,060 LF of transfer piping, installation of nineteen (19) gate valves and one (1) slide gate in control structures. See attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis