Summary
Fort Pierce Utilities Authority (FPUA) is accepting proposals from qualified, licensed, and insured contractors for the turnkey installation of two predesigned blast wall enclosures to protect an above ground gasoline/diesel fuel tank and a liquefied natural gas (LNG) fueling station tank at the Energy Services Center (ESC) located at 1701 South 37th Street, Fort Pierce, FL. The scope of work includes hazard modeling (blast, thermal, dispersion), full structural and civil design, permitting, regulatory submittals, materials procurement, construction, commissioning, and project closeout, with bonds required. The project must comply with HUD, NFPA 30, NFPA 59A, UFC, API RP 752/753, and Florida Building Code wind-borne debris standards, with an estimated completion date of approximately March 1, 2027.