Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes demolition of existing trunk manhole housekeeping pads, frames and covers,coatings and liners, and rungs, installation of new frames and covers, housekeeping pads, and coatings, concrete patching at trunk manhole channels and benches, raising and lowering trunk manholes to grade, sewer flow control.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project will rehabilitate approx 6,439 LF of existing corroded 18" to 24" diameter reinforced concrete pipe (RCP) on the Dalton Trunk Section 3 Sewer with cured-in-place pipe liner and 20 manholes with a protective coating system and all appurtenant work.
Posted Date
Jan 14, 2026
Due Date
Feb 17, 2026
Release: Jan 14, 2026
Close: Feb 17, 2026
The project will rehabilitate approx 6,439 LF of existing corroded 18" to 24" diameter reinforced concrete pipe (RCP) on the Dalton Trunk Section 3 Sewer with cured-in-place pipe liner and 20 manholes with a protective coating system and all appurtenant work.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Los Angeles County Sanitation Districts is soliciting contractors to rehabilitate approximately 4,344 feet of existing corroded 18-inch reinforced concrete pipe using cured-in-place pipe (CIPP) lining. The project also includes applying a protective coating system to 15 manholes and completing all appurtenant work required for the sewer rehabilitation. This trenchless rehabilitation project addresses structural issues in the Montebello Diversion Trunk Sewer and utilizes QuestCDN for bid document distribution.
Posted Date
Jan 28, 2026
Due Date
Mar 3, 2026
Release: Jan 28, 2026
Close: Mar 3, 2026
The Los Angeles County Sanitation Districts is soliciting contractors to rehabilitate approximately 4,344 feet of existing corroded 18-inch reinforced concrete pipe using cured-in-place pipe (CIPP) lining. The project also includes applying a protective coating system to 15 manholes and completing all appurtenant work required for the sewer rehabilitation. This trenchless rehabilitation project addresses structural issues in the Montebello Diversion Trunk Sewer and utilizes QuestCDN for bid document distribution.
AvailablePalm Beach County Department of Airports is inviting sealed bids for the Runway 10L-28R Rehabilitation at Palm Beach International Airport (Project PB 25-12). The work includes milling and overlay of the runway and blast pads, shoulder reconstruction, runway safety area grading, drainage improvements, markings, and electrical improvements including lighting and signage. Bids are due at 2:00 PM local time on February 10, 2026, with contract documents available through the County’s Vendor Self-Service portal.
Posted Date
-
Due Date
Feb 10, 2026
Close: Feb 10, 2026
Palm Beach County Department of Airports is inviting sealed bids for the Runway 10L-28R Rehabilitation at Palm Beach International Airport (Project PB 25-12). The work includes milling and overlay of the runway and blast pads, shoulder reconstruction, runway safety area grading, drainage improvements, markings, and electrical improvements including lighting and signage. Bids are due at 2:00 PM local time on February 10, 2026, with contract documents available through the County’s Vendor Self-Service portal.
AvailableProject consists of rehabilitating, preparing, and lining sanitary manholes.
Posted Date
-
Due Date
Feb 17, 2026
Close: Feb 17, 2026
Project consists of rehabilitating, preparing, and lining sanitary manholes.