Summary
The scope of work for the projects executed by task orders under the contract include various construction projects such as facility repair/alteration, and real property repair/alteration projects on an as needed basis in an expeditious manner. Examples include interior and exterior building construction, repair, rehabilitation, and alterations/restorations, including but not limited to: office renovations with painting and carpeting as part of a total scope; repair or replacement of electrical, carpentry, masonry, plumbing, and mechanical; storm drainage, exterior renovations, roof repair and/or replacement, demolition services, earthwork, pavement repair and/or replacements, building foundations, walls, and structural systems; abatement of lead, asbestos, mold and other hazardous substances; and other miscellaneous construction services. The contractor shall furnish all necessary supervision, labor, parts, tools, materials, equipment, licenses, insurances, bonding, etc. , (except as may otherwise be provided for in the order specifications) to perform. Mechanical/hvac: mechanical and hvac work may be completed under this contract as either the primary work under a task order or incidental to the overall work. Work may include: rehabilitation, repair, or replacement of hvac systems; plumbing systems; waste water drainage systems; pumps and pump stations, hydraulic equipment, fire alarm systems; fire protection sprinkler systems; fire suppression systems; back flow preventers; and all devices, equipment and components associated with constructing and installing mechanical/hvac systems. The mechanical and plumbing engineers are responsible for making sure that all appropriate codes are met. See attached file.