Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Port Angeles is seeking a qualified consulting firm for engineering design and construction support services for the replacement of approximately 14,500 linear feet of 24-inch diameter ductile iron water main between the Port Angeles Water Treatment Plant and D Street.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide Water System Improvements 16" Transmission Main From Treatment Plant To SH-32 & Water Well No. 3. Work includes Section A: 4,870 LF of 16" PVC C900 DR18 Waterline; 2 Ea. 16" Interconnection; 6 Ea. 16" Butterfly Valve & Box. Section B: 20 VF Drill 20" Diameter Hole; 360 VF Drill 16" Diameter Hole; 360 VF Drill 6" Test Well with Zone Specific Sampling; 200 V.F. 0" O.D. Stainless Steel Screen; 260 VF 10" PVC SDR 17 Certa Lok Well Casing; 21 VF 16" O.D. Steel Surface Casing 1/2" Thick. Section C: 3,555 LF 8" PVC C900 DR18 Waterline; 715 LF 6" PVC C900 DR18 Waterline; 1 Ea. 8" Interconnection; 4 Ea. 8" Gate Valve & Box.
Posted Date
Jan 8, 2026
Due Date
Jan 30, 2026
Release: Jan 8, 2026
Close: Jan 30, 2026
Provide Water System Improvements 16" Transmission Main From Treatment Plant To SH-32 & Water Well No. 3. Work includes Section A: 4,870 LF of 16" PVC C900 DR18 Waterline; 2 Ea. 16" Interconnection; 6 Ea. 16" Butterfly Valve & Box. Section B: 20 VF Drill 20" Diameter Hole; 360 VF Drill 16" Diameter Hole; 360 VF Drill 6" Test Well with Zone Specific Sampling; 200 V.F. 0" O.D. Stainless Steel Screen; 260 VF 10" PVC SDR 17 Certa Lok Well Casing; 21 VF 16" O.D. Steel Surface Casing 1/2" Thick. Section C: 3,555 LF 8" PVC C900 DR18 Waterline; 715 LF 6" PVC C900 DR18 Waterline; 1 Ea. 8" Interconnection; 4 Ea. 8" Gate Valve & Box.
AvailableDesign and construct water treatment plant process upgrades, including clarifiers, at the Ferncliff Water Treatment Plant.
Posted Date
Dec 10, 2025
Due Date
Jan 23, 2026
Release: Dec 10, 2025
Close: Jan 23, 2026
Design and construct water treatment plant process upgrades, including clarifiers, at the Ferncliff Water Treatment Plant.
AvailablePerform inspection services during the reservoir 1 water treatment plant filter valve replacement project.
Posted Date
Jan 7, 2026
Due Date
Feb 5, 2026
Release: Jan 7, 2026
Close: Feb 5, 2026
Perform inspection services during the reservoir 1 water treatment plant filter valve replacement project.
AvailableProject consists of 1,440 LF 6" PVC C900 CL 235 water main replacement, 35 LF remove & replace (in-place) existing 12" water main with 12" PVC C900 CL 235 water main, 22 LF furnish & install 12" PVC C900 CL 235 water main, 2 EA furnish & install 12" butterfly valve, 5 EA construct 6" fire hydrant assembly (excluding valve), 39 EA construct 1" water service, 2 EA abandon existing water main, see outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 29, 2026
Release: Dec 3, 2025
Close: Jan 29, 2026
Project consists of 1,440 LF 6" PVC C900 CL 235 water main replacement, 35 LF remove & replace (in-place) existing 12" water main with 12" PVC C900 CL 235 water main, 22 LF furnish & install 12" PVC C900 CL 235 water main, 2 EA furnish & install 12" butterfly valve, 5 EA construct 6" fire hydrant assembly (excluding valve), 39 EA construct 1" water service, 2 EA abandon existing water main, see outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis