Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnish and install traffic signal; grind existing thermoplastic striping, pavement markings, and raised pavement markings; thermoplastic striping, pavement markers, and refreshing thermoplastic striping; construct PCC median.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Installation of a full traffic signal with a pedestrian walk signal along with ADA improvements to the intersection. In addition, construct a side path on college avenue along the pelican marsh natural area from the intersection to the existing sidewalk. Work includes: asphalt and concrete removals, earthwork, erosion control, curb, sidewalks, landscaping, traffic signal foundations, installation of traffic signals (traffic signal controller, controller cabinet and poles.
Posted Date
Dec 5, 2025
Due Date
Jan 7, 2026
Release: Dec 5, 2025
Close: Jan 7, 2026
Installation of a full traffic signal with a pedestrian walk signal along with ADA improvements to the intersection. In addition, construct a side path on college avenue along the pelican marsh natural area from the intersection to the existing sidewalk. Work includes: asphalt and concrete removals, earthwork, erosion control, curb, sidewalks, landscaping, traffic signal foundations, installation of traffic signals (traffic signal controller, controller cabinet and poles.
Premium
Access the largest public sector contact database
Removing and replacing a damaged traffic signal pole. This project includes the following: The work consists of removing and replacing a damaged traffic signal pole at the intersection of Drive. The existing signal mast arm, signal heads, detection camera, preemption, streetlight arms and fixtures, signs and foundation will be reused. No onsite work to remove any of the components shall commence until the new traffic signal pole has been delivered. Setup proper, previously approved, traffic control to establish work area. Provide and maintain traffic control per the Virginia Work Area Protection Manual during all work activities. Carefully remove the existing mast arm, signal heads, detection camera, preemption, attached signage, streetlight arms and luminaires, and all associated wiring. Remove and dispose of the damaged traffic signal pole. Inspect and clean the existing foundation. Install the new traffic signal pole of the same height, finish (black powder-coated steel), and base-plate configuration to match the existing mast arm and foundation. Reinstall the existing mast arm, signal heads, detection camera, preemption, signage, streetlight arms and luminaires, on the new pole. New wiring shall be used from the signal pole terminal block to all equipment on the pole/mast arm. Reconnect all wiring or grounding as needed to ensure proper electrical operation for both the traffic signal and streetlight. Test and aim all signal heads and the streetlight to ensure correct operation and illumination pattern. Coordinate with City traffic signal staff for power shutdown and reactivation. Provide all labor, equipment, materials, and incidental items necessary for a complete and operational installation.
Posted Date
Nov 17, 2025
Due Date
Jan 6, 2026
Release: Nov 17, 2025
Close: Jan 6, 2026
Removing and replacing a damaged traffic signal pole. This project includes the following: The work consists of removing and replacing a damaged traffic signal pole at the intersection of Drive. The existing signal mast arm, signal heads, detection camera, preemption, streetlight arms and fixtures, signs and foundation will be reused. No onsite work to remove any of the components shall commence until the new traffic signal pole has been delivered. Setup proper, previously approved, traffic control to establish work area. Provide and maintain traffic control per the Virginia Work Area Protection Manual during all work activities. Carefully remove the existing mast arm, signal heads, detection camera, preemption, attached signage, streetlight arms and luminaires, and all associated wiring. Remove and dispose of the damaged traffic signal pole. Inspect and clean the existing foundation. Install the new traffic signal pole of the same height, finish (black powder-coated steel), and base-plate configuration to match the existing mast arm and foundation. Reinstall the existing mast arm, signal heads, detection camera, preemption, signage, streetlight arms and luminaires, on the new pole. New wiring shall be used from the signal pole terminal block to all equipment on the pole/mast arm. Reconnect all wiring or grounding as needed to ensure proper electrical operation for both the traffic signal and streetlight. Test and aim all signal heads and the streetlight to ensure correct operation and illumination pattern. Coordinate with City traffic signal staff for power shutdown and reactivation. Provide all labor, equipment, materials, and incidental items necessary for a complete and operational installation.
AvailableRemoving and replacing a damaged traffic signal pole. This project includes the following: The work consists of removing and replacing a damaged traffic signal pole at the intersection of Drive. The existing signal mast arm, signal heads, detection camera, preemption, streetlight arms and fixtures, signs and foundation will be reused. No onsite work to remove any of the components shall commence until the new traffic signal pole has been delivered. Setup proper, previously approved, traffic control to establish work area. Provide and maintain traffic control per the Virginia Work Area Protection Manual during all work activities. Carefully remove the existing mast arm, signal heads, detection camera, preemption, attached signage, streetlight arms and luminaires, and all associated wiring. Remove and dispose of the damaged traffic signal pole. Inspect and clean the existing foundation. Install the new traffic signal pole of the same height, finish (black powder-coated steel), and base-plate configuration to match the existing mast arm and foundation. Reinstall the existing mast arm, signal heads, detection camera, preemption, signage, streetlight arms and luminaires, on the new pole. New wiring shall be used from the signal pole terminal block to all equipment on the pole/mast arm. Reconnect all wiring or grounding as needed to ensure proper electrical operation for both the traffic signal and streetlight. Test and aim all signal heads and the streetlight to ensure correct operation and illumination pattern. Coordinate with City traffic signal staff for power shutdown and reactivation. Provide all labor, equipment, materials, and incidental items necessary for a complete and operational installation.
Posted Date
Nov 17, 2025
Due Date
Jan 6, 2026
Release: Nov 17, 2025
Close: Jan 6, 2026
Removing and replacing a damaged traffic signal pole. This project includes the following: The work consists of removing and replacing a damaged traffic signal pole at the intersection of Drive. The existing signal mast arm, signal heads, detection camera, preemption, streetlight arms and fixtures, signs and foundation will be reused. No onsite work to remove any of the components shall commence until the new traffic signal pole has been delivered. Setup proper, previously approved, traffic control to establish work area. Provide and maintain traffic control per the Virginia Work Area Protection Manual during all work activities. Carefully remove the existing mast arm, signal heads, detection camera, preemption, attached signage, streetlight arms and luminaires, and all associated wiring. Remove and dispose of the damaged traffic signal pole. Inspect and clean the existing foundation. Install the new traffic signal pole of the same height, finish (black powder-coated steel), and base-plate configuration to match the existing mast arm and foundation. Reinstall the existing mast arm, signal heads, detection camera, preemption, signage, streetlight arms and luminaires, on the new pole. New wiring shall be used from the signal pole terminal block to all equipment on the pole/mast arm. Reconnect all wiring or grounding as needed to ensure proper electrical operation for both the traffic signal and streetlight. Test and aim all signal heads and the streetlight to ensure correct operation and illumination pattern. Coordinate with City traffic signal staff for power shutdown and reactivation. Provide all labor, equipment, materials, and incidental items necessary for a complete and operational installation.
AvailableProvide an annual services contract for traffic management center, traffic signal timing and signal design services.
Posted Date
Dec 5, 2025
Due Date
Feb 4, 2026
Release: Dec 5, 2025
Close: Feb 4, 2026
Provide an annual services contract for traffic management center, traffic signal timing and signal design services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis