Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Arizona Department of Transportation is advertising a construction project in Yuma County to install a new traffic signal at County 14th Street and Avenue C and perform related work. The scope includes removing an existing stop sign with flasher, installing signal poles, foundations, conduit, traffic signal equipment, pavement markings, and new signs; a related intersection at Avenue G includes widening and a new signal. Bids open on February 20, 2026, and the project is listed under the Southwest District with pre‑qualification required.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
(2,231-Ft) Intersection Improvements, Traffic Signal Modernization, ADA compliant curb ramps at pedestrian crossings, driveway improvements, pavement markings, landscaping, roadway lighting. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
(2,231-Ft) Intersection Improvements, Traffic Signal Modernization, ADA compliant curb ramps at pedestrian crossings, driveway improvements, pavement markings, landscaping, roadway lighting. See outside link.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Approx. 108 U Tree removal (6 to 15 U diameter); 6,398 CY earth excavation; 8,024 SY topsoil furnish and place, 6"; 3,653 SY sodding; 3,238 SY sodding, salt tolerant; 1,085 SY aggregate subgrade improvement; 5,490 SY Portland cement concrete base course 9"; 1,387 SY Portland cement concrete base course widening 9". See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Approx. 108 U Tree removal (6 to 15 U diameter); 6,398 CY earth excavation; 8,024 SY topsoil furnish and place, 6"; 3,653 SY sodding; 3,238 SY sodding, salt tolerant; 1,085 SY aggregate subgrade improvement; 5,490 SY Portland cement concrete base course 9"; 1,387 SY Portland cement concrete base course widening 9". See outside link.
AvailableConstruction of traffic signal.
Posted Date
Nov 10, 2025
Due Date
Jan 13, 2026
Release: Nov 10, 2025
Close: Jan 13, 2026
Construction of traffic signal.
AvailableInstallation of a full traffic signal with a pedestrian walk signal along with ADA improvements to the intersection. In addition, construct a side path on college avenue along the pelican marsh natural area from the intersection to the existing sidewalk. Work includes: asphalt and concrete removals, earthwork, erosion control, curb, sidewalks, landscaping, traffic signal foundations, installation of traffic signals (traffic signal controller, controller cabinet and poles.
Posted Date
Dec 5, 2025
Due Date
Jan 7, 2026
Release: Dec 5, 2025
Close: Jan 7, 2026
Installation of a full traffic signal with a pedestrian walk signal along with ADA improvements to the intersection. In addition, construct a side path on college avenue along the pelican marsh natural area from the intersection to the existing sidewalk. Work includes: asphalt and concrete removals, earthwork, erosion control, curb, sidewalks, landscaping, traffic signal foundations, installation of traffic signals (traffic signal controller, controller cabinet and poles.