Summary
Track, field, and scoreboard replacement: the project includes the following features: resurfacing the existing track surface-includes surface preparation, patching, and application of new track surfacing and striping for athletic performance. Replacement of synthetic turf field- complete removal and disposal of the existing turf system, subgrade preparation, and installation of new synthetic turf with infill. Removal of existing scoreboard assembly: disconnection and removal of the current scoreboard and associated components. Installation of new digital display system includes furnishing and installing a new id panel, video display, scoreboard, and clock box on the exterior of the existing parking structure "c", with all necessary electrical and data connections.