Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Historical Rehabilitation Project. This project is for the rehabilitation of an existing, historic building. This project includes interior and exterior rehabilitation to the James Townley House. The proposed project will maintain the historic character of the building while rehabilitating its interior, exterior enclosure, and allowing for handicapped accessibility to the first floor. The interior scope of work includes rehabilitation of all interior building areas. The majority of existing interior finishes are failing, with interior plaster walls and ceilings varying from minor surface flaking/cracking to complete failure. The scope of work assesses existing conditions and will repair/resurface where feasible and replace where repair is not feasible. Existing trims, bases, and moldings are to be repaired where feasible, where repair is not feasible, they will be replaced in kind. The intent is to repair/refinish the majority of historic wood floor surfaces, where feasible. New floor finishes will be utilized in the existing and new toilet room as well as the kitchen. Non-historic doors will be replaced, existing historic doors will be repaired where feasible. Windows will be removed and repaired/restored where feasible, where repair is not feasible, new replacement windows will match existing. New electrical, HVAC, and plumbing systems will be included throughout the project, all new systems will be concealed from view to the extent feasible. An accessible interior ramp will connect the two different elevation areas of the first-floor level (there is an elevation change of approximately 6 inches existing), to allow for an accessible route throughout the first level. New HVAC systems will serve both habitable levels of the building, with all required systems and ductwork being concealed to either the basement or attic spaces and serving the first and second level directly. Two small condensing units will be outside the building, screened by appropriate fencing and landscaping.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
25/26 Cape Seal Project.
Posted Date
Jan 22, 2026
Due Date
Feb 26, 2026
Release: Jan 22, 2026
Close: Feb 26, 2026
25/26 Cape Seal Project.
Available2025-26 capital outlay project.
Posted Date
Jan 22, 2026
Due Date
Jan 29, 2026
Release: Jan 22, 2026
Close: Jan 29, 2026
2025-26 capital outlay project.
AvailableDiscoveries in Sculpture, Inc. is soliciting sealed bids for the Randall House Restoration Project (EPF No. 237443) at 22 Front Street, Binghamton, NY to be let as a single prime general construction contract. Work includes masonry and chimney repairs, roof repairs, interior restoration (wood flooring, plaster), door replacement, new floor finishes, and upgrades to mechanical, electrical, and fire alarm systems; the project is funded in part by a grant from the NYS Office of Parks, Recreation and Historic Preservation (Title 9 EPF). Bids are due Jan 28, 2026 at 12:00 PM local time; bid security (5%) and 100% payment and performance bonds are required, and a pre-bid meeting is scheduled for Jan 8, 2026 at 10:00 AM at the project site.
Posted Date
Dec 19, 2025
Due Date
Jan 28, 2026
Release: Dec 19, 2025
Close: Jan 28, 2026
Provide opera house renovation. The building is in need of strengthening to its roof trusses, a new edpm roof, replacement of the back wall, and a new egress stair tower.
Posted Date
Dec 19, 2025
Due Date
Feb 4, 2026
Release: Dec 19, 2025
Close: Feb 4, 2026
Provide opera house renovation. The building is in need of strengthening to its roof trusses, a new edpm roof, replacement of the back wall, and a new egress stair tower.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Discoveries in Sculpture, Inc. is soliciting sealed bids for the Randall House Restoration Project (EPF No. 237443) at 22 Front Street, Binghamton, NY to be let as a single prime general construction contract. Work includes masonry and chimney repairs, roof repairs, interior restoration (wood flooring, plaster), door replacement, new floor finishes, and upgrades to mechanical, electrical, and fire alarm systems; the project is funded in part by a grant from the NYS Office of Parks, Recreation and Historic Preservation (Title 9 EPF). Bids are due Jan 28, 2026 at 12:00 PM local time; bid security (5%) and 100% payment and performance bonds are required, and a pre-bid meeting is scheduled for Jan 8, 2026 at 10:00 AM at the project site.