CityIN
Posted
Nov 23, 2026
Dec 8, 2026
2027 Road Resurfacing Project RFP
Work inlcudes milling and resurfacing of various roadways throughout the town, associated sidewalk, curb, curb ramp, and pavement marking work.
Description: The Town of Surfside Beach seeks qualified bidders to resurface certain town roads in accordance with the bid package. Bids are scheduled to be publicly opened on December 14, 2026, at 10:00 a.m., and questions are due November 30, 2026, at 5:00 p.m. The advertisement classifies the procurement as construction and directs bidders to the Town's bid-postings page for project details and documents.
City · SC, US
Adjacent opportunities open for bidding right now.
CityIN
Posted
Nov 23, 2026
Dec 8, 2026
Work inlcudes milling and resurfacing of various roadways throughout the town, associated sidewalk, curb, curb ramp, and pavement marking work.
CityTN
Posted
Nov 25, 2026
Dec 24, 2026
The selected contractor will be responsible for providing all labor, materials, equipment, and services necessary to complete the project. 1. Existing roadway removal: mill, remove, or tear up existing pavement as necessary to prepare the roadways for reconstruc- tion. 2. Roadway preparation: inspect and prepare the existing road base. Address areas of deterioration, soft spots, drainage issues, and structural deficiencies before installing new pavement. 3. Base repair and stabilization: repair or replace unsuitable road base materials and properly grade and compact the roadway to provide a stable foundation. 4. Asphalt installation: install new asphalt pavement at appro- priate depths and specifications to provide a durable, smooth, and consistent driving surface. 5. Grading and drainage: ensure proper roadway grading, drainage, and water runoff to help prevent standing water and pre- mature pavement deterioration. 6. Roadway transitions: properly address intersections, drive- ways, street connections, and existing pavement transitions to provide safe and smooth access. 7. Traffic control and safety: provide appropriate traffic control devices, signage, barricades, and other safety measures through- out construction to protect motorists, pedestrians, and construc- tion personnel. 8. Final cleanup: remove construction debris, excess materials, and equipment upon completion of the project.
CityAL
Posted
Oct 24, 2026
Nov 30, 2026
Work includes 13147 SY of ituminous treatment - g; 106 SY of remove existing driveway (concrete, gravel, asphalt; 1193 ton of superpave bituminous concrete wearing surface layer, 3/4" maximum aggregate size mix, esal, range a/b (approx. 165 lb/sy; silt fenc silt fenc. , solid yellow, class 2, type a traffic stripe (4" centerline), 72 SF of emporary traffic control markings (paint.
CityIL
Posted
Nov 23, 2026
Dec 11, 2026
The Village of Deerfield is soliciting Phase III engineering services for the resurfacing of Wilmot Road between Deerfield Road and Lake Cook Road, including pavement grinding and resurfacing, curb and gutter replacement, ADA curb ramp upgrades, and drainage structure adjustments. Services must include construction inspection, documentation, coordination during resurfacing, and provision of staff, vehicles, and appropriate test equipment. The project has an estimated construction cost of $1M, is targeted for an April IDOT letting, and engineering services are to commence in early 2027.
Decision makers connected to this RFP from Town of Surfside Beach.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
225 days before RFP
Surfside Beach's FY2026-27 budget-retreat materials proposed a capital program including annual road resurfacing.
FY2026-27 Proposed Budgets to Review-General Fund • Court -- No significant changes • Facilities • Lifecycle maintenance-moved to Overhead Transfer to Capital Projects • Unfreeze the Laborer position • Non Departmental • Equivalent of 6 months projected insurance increase (Jan-Jun) • Heritage Contract and Computer Replacements • Transfer Out to Capital…
Surfside Beach Town Council Budget Retreat Minutes
Board meeting · Apr 9, 2026
Board meeting
206 days before RFP
Public Works proposed including the affected Ocean Boulevard stretch in the next regular street-paving project.
>> All right. And thank you very much. We will move on to public works. Director Dare. >> Good evening, Mayor, Council, and Citizen. uh for March. Um I'll say for our sanitation division, I will say that we uh did have our uh twice a year household hazardous waste drop off event uh on April 10th to 12th and that went very well for three days. About 60…
Budget
142 days before RFP
The adopted FY2026-27 Town budget included street paving in its Capital Projects program.
Adopted Budget Town of Surfside Beach Fiscal Year 2026-2027 2 TABLE OF CONTENTS 1. Elected Officials ............................................. 3 2. Organizational Chart ...................................... 4 3. Summary and Key Points .............................. 5 4. General Fund Summary ................................ 6 5. General Fund…
Board meeting
24 days before RFP
Town staff reported that the road-paving project was still being engineered for the following spring.
>> I have a few um sure the road paving where is that occurring do you know >> road >> where or when >> where >> uh I have a list but I haven't published it yet. >> Oh okay. So this is next spring >> still being engineered next spring. Um,
Town Council Meeting
Board meeting · Oct 27, 2026
RFP published
Proposals due (15 days left)
City Council Meeting
Board meeting · Apr 28, 2026
Town of Surfside Beach FY2026-27 Budget
Budget · Jul 1, 2026