Summary
Work consists of a partial roof replacement to an existing building. Removal of existing membrane roofing, insulation, cant strips and tapered edges, and metal flashing. Offsite disposal of all removed materials. Removal and replacement of existing roof accessories. Removal and replacement of deteriorated roof decking and wood blocking. Removal and replacement of existing roof drains and related piping and insulation. Provision and installation of EPDM membranes, underlayment, and flat and tapered insulation. Provision and installation of new flashing, caps, fascia, and other trim metal work as detailed and specified.