Work includes right-turn lane and acceleration lane construction for taxes u-turn. Continuous traffic control, roadway widening, excavation, embankment, and pavement construction for right-turn lanes, and acceleration lanes to create taxes u-turn lane; illumination relocation, construction of metal beam guard fence with mow strip, drainage modifications, installing traffic signal, curb and gutter removal and replacement, asphalt paving, pavement markings, and associated roadway improvements within project limits. Match existing pavement markings to plans and conform to the TMUTCD.