Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Brockway
Project involves the drilling, developing, and testing of final well #3 as a municipal supply well.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Scott County Housing Authority
Work includes : 504 improvements, phase 3 and exterior improvements.
Posted Date
Nov 4, 2025
Due Date
Dec 11, 2025
Release: Nov 4, 2025
Scott County Housing Authority
Close: Dec 11, 2025
Work includes : 504 improvements, phase 3 and exterior improvements.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Orange Co Sanitation District
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
Posted Date
Dec 1, 2025
Due Date
Jan 26, 2026
Release: Dec 1, 2025
Orange Co Sanitation District
Close: Jan 26, 2026
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
AvailableCity of Commerce
Seeking engineering design and construction/bid document services for a municipal groundwater well infrastructure project (new groundwater well, ground storage tank, chemical feed system, piping and pumping) including a Preliminary Engineering Report (PER) and, if funded, design, bidding, and construction management services.
Posted Date
Nov 12, 2025
Due Date
Dec 15, 2025
Release: Nov 12, 2025
City of Commerce
Close: Dec 15, 2025
Seeking engineering design and construction/bid document services for a municipal groundwater well infrastructure project (new groundwater well, ground storage tank, chemical feed system, piping and pumping) including a Preliminary Engineering Report (PER) and, if funded, design, bidding, and construction management services.
AvailableBorough of Chatham
Project include well 3 rehabilitation. .
Posted Date
-
Due Date
Dec 19, 2025
Borough of Chatham
Close: Dec 19, 2025
Project include well 3 rehabilitation. .
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →