Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Los Angeles Bureau of Engineering issued a Task Order Solicitation (TOS No. 114) to obtain consultant bid & award and design support during construction services for intersection improvements along Glendale Boulevard and Hyperion Avenue. The work focuses on multimodal improvements including bicycle and pedestrian facilities and tasks such as RFI responses, shop drawing reviews, and change order analysis. Only firms listed on the Pre-Qualified On-Call Bridge/Civil Engineering and Other Design Support Services Consultants List may submit proposals.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Los Angeles, Bureau of Engineering, is soliciting pre‑design services for the Los Feliz Boulevard Parkway Improvements and Cycletrack project. The scope focuses on feasibility and concept development, preliminary engineering, coordination with stakeholders, and development of pre‑design deliverables to inform subsequent design and implementation. Proposals are due January 29, 2026.
Posted Date
Dec 23, 2025
Due Date
Jan 29, 2026
Release: Dec 23, 2025
Close: Jan 29, 2026
The City of Los Angeles, Bureau of Engineering, is soliciting pre‑design services for the Los Feliz Boulevard Parkway Improvements and Cycletrack project. The scope focuses on feasibility and concept development, preliminary engineering, coordination with stakeholders, and development of pre‑design deliverables to inform subsequent design and implementation. Proposals are due January 29, 2026.
AvailableWork includes approx 6,845 LF 8" DIP water main; 84 LF 3/4" to 1" type K copper water services; 1,065 SY seeding and mulching; 495 SF 4" concrete sidewalk; 11 Ea fire hydrant assembly.
Posted Date
Jan 7, 2026
Due Date
Jan 29, 2026
Release: Jan 7, 2026
Close: Jan 29, 2026
Work includes approx 6,845 LF 8" DIP water main; 84 LF 3/4" to 1" type K copper water services; 1,065 SY seeding and mulching; 495 SF 4" concrete sidewalk; 11 Ea fire hydrant assembly.
AvailableThis RFP is for a Pedestrian Improvement project/contract involving 0.592 miles of clearing & grubbing, grading, curb & gutter, sidewalk, drainage, striping, water service connections, and sewer manhole adjustments.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
This RFP is for a Pedestrian Improvement project/contract involving 0.592 miles of clearing & grubbing, grading, curb & gutter, sidewalk, drainage, striping, water service connections, and sewer manhole adjustments.
AvailableThe City of Fort Collins is seeking proposals from qualified Contractors for Construction Manager / General Contractor (CM/GC) services on behalf of the Fort Collins One Water Utility related to the design and construction of the College Avenue Water System Improvement Project. The project focuses on the replacement of an existing 4" water main along the eastern portion of College Avenue from Mulberry Street to Laporte Avenue. Requested services include Construction Manager tasks during the preconstruction phase and General Contractor tasks during construction.
Posted Date
Jan 22, 2026
Due Date
Feb 19, 2026
Release: Jan 22, 2026
Close: Feb 19, 2026
The City of Fort Collins is seeking proposals from qualified Contractors for Construction Manager / General Contractor (CM/GC) services on behalf of the Fort Collins One Water Utility related to the design and construction of the College Avenue Water System Improvement Project. The project focuses on the replacement of an existing 4" water main along the eastern portion of College Avenue from Mulberry Street to Laporte Avenue. Requested services include Construction Manager tasks during the preconstruction phase and General Contractor tasks during construction.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis